London Overground had 51,430 scheduled stops at Watford Junction in the 13 periods to Period 7 of 2026-27, 33% of the station's total. 92.9% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
London Overground trains at Watford Junction also serve Watford High Street (1.3 km south, 86.6% on time, 3.3% cancelled), Bushey (2.2 km south, 87.7% on time, 3.3% cancelled), Carpenders Park (4.1 km south, 86.9% on time, 3.3% cancelled), Hatch End (6.3 km south, 87.0% on time, 3.3% cancelled), Headstone Lane (7.3 km south, 87.4% on time, 3.3% cancelled) and Harrow and Wealdstone (9.0 km south-east, 86.7% on time, 2.9% cancelled), which are the stations on its network closest to Watford Junction.
Within 30 km of here, London Overground runs best at Chingford, 28.2 km east (96.4%), and worst at Finchley Road and Frognal, 19.4 km south-east (75.2%).
The busiest London Overground station within 30 km of Watford Junction is Highbury and Islington, 24.1 km south-east, with about 593 scheduled stops a day.
London Overground at Watford Junction has slipped a little, from 96.1% within three minutes in the previous 13 periods to 92.9% in the latest 13, a fall of 3.2 percentage points. Cancellations rose to 2.9% of scheduled stops from 1.8%, which is 1.1 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 90.7% | 1.6% |
| Period 6 of 2026-27 | 3,878 | 90.8% | 5.3% |
| Period 5 of 2026-27 | 3,769 | 93.1% | 4.7% |
| Period 4 of 2026-27 | 4,051 | 88.1% | 2.8% |
| Period 3 of 2026-27 | 3,930 | 90.6% | 2.3% |
| Period 2 of 2026-27 | 3,901 | 92.9% | 3.5% |
| Period 1 of 2026-27 | 4,074 | 93.5% | 1.9% |
| Period 13 of 2025-26 | 4,356 | 94.5% | 1.4% |
| Period 12 of 2025-26 | 3,907 | 92.5% | 2.4% |
| Period 11 of 2025-26 | 4,032 | 93.1% | 2.6% |
| Period 10 of 2025-26 | 3,734 | 94.2% | 2.7% |
| Period 9 of 2025-26 | 3,764 | 96.1% | 3.9% |
| Period 8 of 2025-26 | 4,048 | 97.9% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Watford Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 73,558 | 79.1% | 5.9% |
| Avanti | 16,283 | 53.5% | 6.0% |
| GTR | 11,846 | 83.3% | 6.8% |
| Caledonian Sleeper | 546 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out