GTR at Watford Junction
All trains at Watford JunctionGTR across BritainEast of England
How this operator is doing here
GTR had 11,846 scheduled stops at Watford Junction in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 83.3% of recorded arrivals came within three minutes and 6.8% of stops were cancelled.
GTR trains at Watford Junction also serve Radlett (5.9 km north-east, 72.1% on time, 6.5% cancelled), Elstree and Borehamwood (8.1 km east, 70.9% on time, 6.6% cancelled), Harrow and Wealdstone (9.0 km south-east, 84.8% on time, 6.8% cancelled), St Albans City (10.7 km north-east, 72.2% on time, 5.3% cancelled), Mill Hill Broadway (11.7 km south-east, 70.4% on time, 6.6% cancelled) and Wembley Central (14.2 km south-east, 86.3% on time, 6.6% cancelled), which are the stations on its network closest to Watford Junction.
Within 30 km of here, GTR runs best at Battersea Park, 26.9 km south-east (94.1%), and worst at Mill Hill Broadway, 11.7 km south-east (70.4%).
The busiest GTR station within 30 km of Watford Junction is London Victoria, 25.6 km south-east, with about 692 scheduled stops a day.
GTR ranks 2nd of the 4 operators with enough records at Watford Junction, on 83.3%.
For GTR, Watford Junction ranks 163rd of 307 stations and is typical: 83.3% here against 82.9% across the network, a difference of 0.4 percentage points.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 902 | 83.4% | 5.0% |
| Period 6 of 2026-27 | 1,001 | 82.0% | 1.8% |
| Period 5 of 2026-27 | 912 | 85.0% | 12.1% |
| Period 4 of 2026-27 | 994 | 82.5% | 7.2% |
| Period 3 of 2026-27 | 867 | 82.9% | 10.3% |
| Period 2 of 2026-27 | 954 | 80.8% | 12.9% |
| Period 1 of 2026-27 | 792 | 83.2% | 5.1% |
| Period 13 of 2025-26 | 1,076 | 87.5% | 4.3% |
| Period 12 of 2025-26 | 954 | 85.4% | 6.0% |
| Period 11 of 2025-26 | 822 | 81.9% | 4.6% |
| Period 10 of 2025-26 | 906 | 85.8% | 5.4% |
| Period 9 of 2025-26 | 886 | 79.8% | 6.1% |
| Period 8 of 2025-26 | 780 | 82.1% | 7.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Watford Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 73,558 | 79.1% | 5.9% |
| London Overground | 51,430 | 92.9% | 2.9% |
| Avanti | 16,283 | 53.5% | 6.0% |
| Caledonian Sleeper | 546 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out