Avanti at Watford Junction
All trains at Watford JunctionAvanti across BritainEast of England
How this operator is doing here
Avanti had 16,283 scheduled stops at Watford Junction in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 53.5% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
Avanti trains at Watford Junction also serve Harrow and Wealdstone (9.0 km south-east, – on time, – cancelled), Wembley Central (14.2 km south-east, – on time, – cancelled), Tring (21.7 km north-west, – on time, – cancelled), London Euston (23.5 km south-east, 58.3% on time, 5.8% cancelled), Bletchley (43.6 km north-west, – on time, – cancelled) and Milton Keynes Central (48.7 km north-west, 49.6% on time, 4.8% cancelled), which are the stations on its network closest to Watford Junction.
The busiest Avanti station within 30 km of Watford Junction is London Euston, 23.5 km south-east, with about 266 scheduled stops a day.
Of the 4 operators with enough records at Watford Junction, Avanti is the least punctual, at 53.5%.
Avanti at Watford Junction has slipped a little, from 57.7% within three minutes in the previous 13 periods to 53.5% in the latest 13, a fall of 4.2 percentage points. Cancellations rose to 6.0% of scheduled stops from 3.5%, which is 2.5 percentage points more.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,267 | 57.2% | 3.3% |
| Period 6 of 2026-27 | 1,253 | 39.7% | 1.8% |
| Period 5 of 2026-27 | 1,117 | 49.4% | 8.5% |
| Period 4 of 2026-27 | 1,253 | 44.5% | 11.9% |
| Period 3 of 2026-27 | 1,234 | 52.6% | 4.7% |
| Period 2 of 2026-27 | 1,279 | 49.5% | 6.1% |
| Period 1 of 2026-27 | 1,200 | 58.2% | 4.0% |
| Period 13 of 2025-26 | 1,434 | 64.0% | 4.6% |
| Period 12 of 2025-26 | 1,303 | 59.8% | 3.6% |
| Period 11 of 2025-26 | 1,254 | 62.4% | 6.8% |
| Period 10 of 2025-26 | 1,081 | 60.0% | 8.5% |
| Period 9 of 2025-26 | 1,316 | 45.6% | 9.0% |
| Period 8 of 2025-26 | 1,292 | 51.6% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Watford Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 73,558 | 79.1% | 5.9% |
| London Overground | 51,430 | 92.9% | 2.9% |
| GTR | 11,846 | 83.3% | 6.8% |
| Caledonian Sleeper | 546 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out