Wallyford
WAFScotlandManaged by ScotRail
How this station is performing
Wallyford had 17,740 scheduled stops to Period 7 of 2026-27, about 49 a day. 86.9% of recorded arrivals were within three minutes of the timetable and 0.7% of scheduled stops were cancelled.
Wallyford opened on 1 May 1866 and closed to passengers on 15 October 1867. It reopened on 13 June 1994, 32 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Prestonpans is the oldest (1846) and Shawfair the newest (2015), with Wallyford in between.
The nearest stations to Wallyford are Prestonpans (2.8 km north-east), Musselburgh (3.7 km west), Newcraighall (4.8 km west), Shawfair (5.3 km south-west) and Brunstane (5.4 km west). 8 stations lie within 10 km in all. Of the five, Brunstane is the most punctual at 90.1% and Musselburgh the least at 86.7%, with Wallyford on 86.9%.
Wallyford takes its name from a Village called Wallyford, home to about 3,260 people, and the station stands 0.3 km from its centre.
Wallyford has slipped a little, from 90.8% within three minutes in the previous 13 periods to 86.9% in the latest 13, a fall of 3.9 percentage points. Cancellations fell to 0.7% of scheduled stops from 1.7%, which is 1.0 percentage points fewer.
2 of 3 stations of a similar size in Scotland are more punctual than Wallyford on 86.9%. The comparison group includes Musselburgh (86.7%), Maryhill (93.9%) and Possilpark and Parkhouse (93.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 17,740 | 86.9% | 0.7% |
Operators with their own page for this station are linked to it.
Late train at Wallyford? Delay Repay
These operators call at Wallyford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,388 | 84.7% | 1.0% |
| Period 6 of 2026-27 | 1,390 | 88.2% | 0.9% |
| Period 5 of 2026-27 | 1,408 | 83.0% | 0.4% |
| Period 4 of 2026-27 | 1,396 | 82.7% | 1.0% |
| Period 3 of 2026-27 | 1,396 | 86.3% | 1.4% |
| Period 2 of 2026-27 | 1,361 | 87.0% | 0.6% |
| Period 1 of 2026-27 | 1,541 | 86.2% | 0.6% |
| Period 13 of 2025-26 | 1,470 | 89.6% | 0.1% |
| Period 12 of 2025-26 | 1,340 | 88.6% | 0.2% |
| Period 11 of 2025-26 | 1,340 | 87.1% | 0.3% |
| Period 10 of 2025-26 | 1,134 | 86.8% | 0.8% |
| Period 9 of 2025-26 | 1,288 | 88.6% | 0.5% |
| Period 8 of 2025-26 | 1,288 | 91.1% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Musselburgh | 18,106 | 86.7% | 0.6% |
| Maryhill | 17,206 | 93.9% | 1.2% |
| Possilpark and Parkhouse | 17,206 | 93.5% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out