Valley
VALWalesManaged by TfW Rail
How this station is performing
Valley had 8,980 scheduled stops to Period 7 of 2026-27, about 25 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Valley opened on 15 March 1982, 44 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Valley is the newest; the oldest, Holyhead, opened in 1848.
The nearest stations to Valley are Holyhead (5.4 km north-west), Rhosneigr (6.4 km south-east), Ty Croes (8.8 km south-east), Bodorgan (13.0 km south-east) and Llanfairpwll (24.5 km east). 3 stations lie within 10 km in all. Of the five, Holyhead is the most punctual at 78.9% and Rhosneigr the least at 74.6%, with Valley on 77.2%.
Valley takes its name from a Village called Valley, home to about 2,413 people, and the station stands 0.3 km from its centre.
Valley improved sharply over the past year. In the latest 13 periods 77.2% of stops came within three minutes of the timetable, up 7.5 percentage points from 69.7% in the 13 before. Cancellations fell to 2.6% of scheduled stops from 3.1%, which is 0.5 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Valley is the most punctual, at 77.2%. The comparison group includes Baglan (58.3%), Briton Ferry (58.6%) and Llansamlet (60.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,980 | 77.2% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Valley? Delay Repay
These operators call at Valley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 739 | 76.7% | 3.2% |
| Period 6 of 2026-27 | 738 | 73.0% | 2.8% |
| Period 5 of 2026-27 | 679 | 77.1% | 3.7% |
| Period 4 of 2026-27 | 723 | 73.7% | 3.5% |
| Period 3 of 2026-27 | 738 | 80.8% | 2.7% |
| Period 2 of 2026-27 | 696 | 78.4% | 2.3% |
| Period 1 of 2026-27 | 759 | 78.8% | 1.3% |
| Period 13 of 2025-26 | 720 | 83.6% | 2.4% |
| Period 12 of 2025-26 | 655 | 85.4% | 1.7% |
| Period 11 of 2025-26 | 650 | 81.5% | 1.8% |
| Period 10 of 2025-26 | 589 | 78.5% | 3.2% |
| Period 9 of 2025-26 | 638 | 68.5% | 3.8% |
| Period 8 of 2025-26 | 656 | 67.4% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Baglan | 8,752 | 58.3% | 2.7% |
| Briton Ferry | 8,735 | 58.6% | 2.8% |
| Llansamlet | 8,714 | 60.0% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out