Llansamlet
LASWalesManaged by TfW Rail
How this station is performing
Llansamlet had 8,714 scheduled stops to Period 7 of 2026-27, about 24 a day. 60.0% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Llansamlet opened on 1 April 1852 and closed to passengers on 2 November 1964. It reopened on 27 June 1994, 32 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Neath is the oldest (1850) and Baglan the newest (1996), with Llansamlet in between.
The nearest stations to Llansamlet are Skewen (2.7 km east), Briton Ferry (5.2 km south-east), Neath (5.4 km east), Swansea (5.5 km south-west) and Baglan (7.4 km south-east). 5 stations lie within 10 km in all. Of the five, Swansea is the most punctual at 69.0% and Skewen the least at 58.3%, with Llansamlet on 60.0%.
Llansamlet takes its name from a suburb called Llansamlet, home to about 7,041 people, and the station stands 0.4 km from its centre.
For Llansamlet, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 45.8% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2024-25, at 76.0%, which is 30.2 percentage points higher. Cancellations peaked at 14.0% of scheduled stops in Period 3 of 2023-24, against 2.7% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Llansamlet is the most punctual, at 60.0%. The comparison group includes Skewen (58.3%), Briton Ferry (58.6%) and Baglan (58.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,714 | 60.0% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Llansamlet? Delay Repay
These operators call at Llansamlet and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 670 | 58.4% | 2.4% |
| Period 6 of 2026-27 | 677 | 59.9% | 2.5% |
| Period 5 of 2026-27 | 678 | 55.0% | 4.7% |
| Period 4 of 2026-27 | 692 | 58.4% | 5.5% |
| Period 3 of 2026-27 | 690 | 59.7% | 2.0% |
| Period 2 of 2026-27 | 681 | 61.8% | 2.3% |
| Period 1 of 2026-27 | 799 | 63.9% | 2.4% |
| Period 13 of 2025-26 | 750 | 70.2% | 1.5% |
| Period 12 of 2025-26 | 566 | 69.1% | 2.3% |
| Period 11 of 2025-26 | 486 | 70.0% | 2.7% |
| Period 10 of 2025-26 | 643 | 56.8% | 2.5% |
| Period 9 of 2025-26 | 695 | 45.8% | 3.0% |
| Period 8 of 2025-26 | 687 | 53.7% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Skewen | 8,714 | 58.3% | 2.7% |
| Briton Ferry | 8,735 | 58.6% | 2.8% |
| Baglan | 8,752 | 58.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out