Trowbridge
TROSouth WestManaged by Great Western Railway
How this station is performing
Trowbridge had 37,412 scheduled stops to Period 7 of 2026-27, about 103 a day. 74.3% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Trowbridge opened on 5 September 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Trowbridge is the oldest; the next oldest, Westbury, dates from 1848.
The nearest stations to Trowbridge are Bradford-on-Avon (3.9 km north-west), Avoncliff (5.1 km north-west), Westbury (6.1 km south), Freshford (6.5 km west) and Dilton Marsh (7.9 km south). 6 stations lie within 10 km in all. Of the five, Avoncliff is the most punctual at 77.6% and Westbury the least at 69.7%, with Trowbridge on 74.3%.
Trowbridge is one of 2 stations named after a county town called Trowbridge, home to about 37,647 people; this one stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Trowbridge was Period 9 of 2024-25, at 59.5%, some time before the latest year. The strongest was Period 12 of 2025-26, at 85.4%, and the two are 25.9 percentage points apart. Cancellations peaked at 13.4% of scheduled stops in Period 9 of 2024-25, against 4.7% over the latest 13 periods.
2 of 3 stations of a similar size in South West are more punctual than Trowbridge on 74.3%. The comparison group includes St Erth (79.7%), Poole (71.3%) and Lawrence Hill (82.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 37,412 | 74.3% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at Trowbridge? Delay Repay
These operators call at Trowbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,811 | 71.1% | 3.3% |
| Period 6 of 2026-27 | 2,878 | 71.1% | 3.3% |
| Period 5 of 2026-27 | 2,763 | 67.3% | 6.1% |
| Period 4 of 2026-27 | 2,897 | 64.2% | 6.9% |
| Period 3 of 2026-27 | 2,817 | 73.8% | 8.8% |
| Period 2 of 2026-27 | 2,769 | 71.0% | 6.9% |
| Period 1 of 2026-27 | 3,109 | 81.0% | 2.3% |
| Period 13 of 2025-26 | 3,183 | 81.1% | 4.1% |
| Period 12 of 2025-26 | 2,902 | 85.4% | 1.3% |
| Period 11 of 2025-26 | 2,893 | 84.2% | 3.4% |
| Period 10 of 2025-26 | 2,645 | 74.0% | 5.3% |
| Period 9 of 2025-26 | 2,923 | 66.1% | 5.1% |
| Period 8 of 2025-26 | 2,822 | 72.7% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| St Erth | 39,289 | 79.7% | 4.1% |
| Poole | 35,377 | 71.3% | 5.0% |
| Lawrence Hill | 34,630 | 82.8% | 4.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out