St Erth
SERSouth WestManaged by Great Western Railway
How this station is performing
St Erth had 39,289 scheduled stops to Period 7 of 2026-27, about 108 a day. 79.7% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
St Erth opened on 11 March 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, St Erth is the oldest; the next oldest, Hayle, dates from 1852.
The nearest stations to St Erth are Lelant Saltings (0.9 km north), Lelant (1.6 km north), Hayle (2.4 km north-east), Carbis Bay (3.3 km north-west) and St Ives (Cornwall) (4.9 km north-west). 6 stations lie within 10 km in all. Of the five, Lelant Saltings is the most punctual at 97.8% and Hayle the least at 67.9%, with St Erth on 79.7%.
St Erth takes its name from a Village called St Erth, home to about 1,573 people, and the station stands 0.7 km from its centre.
2 operators call at St Erth: Great Western Railway (80.6%, 96% of stops) and CrossCountry (54.1%, 4% of stops). The operator you travel with matters: Great Western Railway reaches 80.6% within three minutes while CrossCountry manages 54.1%, a gap of 26.5 percentage points.
Compared with 3 stations of a similar size in South West, St Erth is the most punctual, at 79.7%. The comparison group includes Trowbridge (74.3%), Truro (74.9%) and Poole (71.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 37,844 | 80.6% | 3.7% |
| CrossCountry | 1,445 | 54.1% | 14.4% |
Operators with their own page for this station are linked to it.
Late train at St Erth? Delay Repay
These operators call at St Erth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,999 | 84.8% | 1.9% |
| Period 6 of 2026-27 | 3,061 | 82.1% | 4.6% |
| Period 5 of 2026-27 | 3,107 | 74.7% | 6.9% |
| Period 4 of 2026-27 | 3,120 | 75.6% | 6.4% |
| Period 3 of 2026-27 | 3,107 | 79.4% | 4.5% |
| Period 2 of 2026-27 | 3,110 | 80.9% | 3.5% |
| Period 1 of 2026-27 | 3,549 | 84.6% | 1.6% |
| Period 13 of 2025-26 | 3,393 | 85.1% | 2.2% |
| Period 12 of 2025-26 | 3,080 | 76.0% | 1.7% |
| Period 11 of 2025-26 | 2,353 | 76.4% | 9.1% |
| Period 10 of 2025-26 | 2,804 | 78.1% | 5.9% |
| Period 9 of 2025-26 | 2,502 | 76.3% | 5.0% |
| Period 8 of 2025-26 | 3,104 | 78.7% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Trowbridge | 37,412 | 74.3% | 4.7% |
| Truro | 42,379 | 74.9% | 5.1% |
| Poole | 35,377 | 71.3% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out