Tolworth
TOLLondonManaged by South Western Railway
How this station is performing
Tolworth had 24,405 scheduled stops to Period 7 of 2026-27, about 67 a day. 85.7% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Tolworth opened on 29 May 1938, 88 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Surbiton is the oldest (1838) and Chessington North the newest (1939), with Tolworth in between.
The nearest stations to Tolworth are Malden Manor (1.6 km north-east), Chessington North (2.0 km south-west), Surbiton (2.4 km north-west), Worcester Park (2.5 km east) and Berrylands (2.5 km north). 58 stations lie within 10 km in all. Of the five, Chessington North is the most punctual at 87.9% and Surbiton the least at 82.9%, with Tolworth on 85.7%.
Tolworth takes its name from an area of London called Tolworth, home to about 9,833 people, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Tolworth was Period 9 of 2024-25, at 68.6%, some time before the latest year. The strongest was Period 5 of 2023-24, at 95.9%, and the two are 27.3 percentage points apart. Cancellations peaked at 12.4% of scheduled stops in Period 9 of 2024-25, against 3.4% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Tolworth is the least punctual, at 85.7%. All of them are ahead, including Chessington North (87.9%), Chessington South (87.0%) and Malden Manor (87.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,405 | 85.7% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Tolworth? Delay Repay
These operators call at Tolworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,849 | 90.1% | 2.2% |
| Period 6 of 2026-27 | 1,857 | 90.8% | 2.6% |
| Period 5 of 2026-27 | 1,928 | 89.7% | 2.9% |
| Period 4 of 2026-27 | 1,928 | 88.0% | 2.0% |
| Period 3 of 2026-27 | 1,735 | 86.1% | 4.8% |
| Period 2 of 2026-27 | 1,908 | 83.4% | 6.3% |
| Period 1 of 2026-27 | 2,170 | 90.5% | 4.2% |
| Period 13 of 2025-26 | 1,867 | 90.5% | 1.9% |
| Period 12 of 2025-26 | 1,899 | 85.3% | 4.1% |
| Period 11 of 2025-26 | 1,896 | 86.5% | 1.5% |
| Period 10 of 2025-26 | 1,650 | 85.0% | 3.2% |
| Period 9 of 2025-26 | 1,832 | 69.6% | 2.0% |
| Period 8 of 2025-26 | 1,886 | 76.1% | 6.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chessington North | 24,405 | 87.9% | 3.4% |
| Chessington South | 24,404 | 87.0% | 3.1% |
| Malden Manor | 24,404 | 87.3% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out