Chessington North
CSNLondonManaged by South Western Railway
How this station is performing
Chessington North had 24,405 scheduled stops to Period 7 of 2026-27, about 67 a day. 87.9% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Chessington North opened on 28 May 1939, 87 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chessington North is the newest; the oldest, Surbiton, opened in 1838.
The nearest stations to Chessington North are Chessington South (1.0 km south-west), Tolworth (2.0 km north-east), Hinchley Wood (3.0 km north-west), Surbiton (3.2 km north) and Claygate (3.3 km west). 50 stations lie within 10 km in all. At 87.9%, Chessington North is more punctual than every one of them; the best of the five, Chessington South, manages 87.0%.
Chessington North is named after Chessington, an area of London, but the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Chessington North was Period 9 of 2024-25, at 75.3%, some time before the latest year. The strongest was Period 5 of 2023-24, at 96.4%, and the two are 21.1 percentage points apart. Cancellations peaked at 12.3% of scheduled stops in Period 9 of 2024-25, against 3.4% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Chessington North is the most punctual, at 87.9%. The comparison group includes Tolworth (85.7%), Chessington South (87.0%) and Malden Manor (87.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,405 | 87.9% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Chessington North? Delay Repay
These operators call at Chessington North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,849 | 92.9% | 2.2% |
| Period 6 of 2026-27 | 1,857 | 92.9% | 2.6% |
| Period 5 of 2026-27 | 1,928 | 91.9% | 2.9% |
| Period 4 of 2026-27 | 1,928 | 89.3% | 2.0% |
| Period 3 of 2026-27 | 1,735 | 87.8% | 4.8% |
| Period 2 of 2026-27 | 1,908 | 86.1% | 6.3% |
| Period 1 of 2026-27 | 2,170 | 92.1% | 4.2% |
| Period 13 of 2025-26 | 1,867 | 91.1% | 1.8% |
| Period 12 of 2025-26 | 1,899 | 86.1% | 4.1% |
| Period 11 of 2025-26 | 1,896 | 87.3% | 1.5% |
| Period 10 of 2025-26 | 1,650 | 85.9% | 3.2% |
| Period 9 of 2025-26 | 1,832 | 76.2% | 2.0% |
| Period 8 of 2025-26 | 1,886 | 80.9% | 6.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tolworth | 24,405 | 85.7% | 3.4% |
| Chessington South | 24,404 | 87.0% | 3.1% |
| Malden Manor | 24,404 | 87.3% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out