Malden Manor
MALLondonManaged by South Western Railway
How this station is performing
Malden Manor had 24,404 scheduled stops to Period 7 of 2026-27, about 67 a day. 87.3% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Malden Manor opened on 29 May 1938, 88 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Malden Manor is the newest; the oldest, New Malden, opened in 1846.
The nearest stations to Malden Manor are Worcester Park (1.1 km east), Tolworth (1.6 km south-west), Motspur Park (1.9 km north-east), Berrylands (2.1 km north-west) and New Malden (2.2 km north). 63 stations lie within 10 km in all. At 87.3%, Malden Manor is more punctual than every one of them; the best of the five, New Malden, manages 87.1%.
Malden Manor is named after Old Malden, an area of London, home to about 9,012 people, but the station stands 1.2 km from its centre.
Across the whole run of data, the weakest four-week period for Malden Manor was Period 9 of 2024-25, at 75.1%, some time before the latest year. The strongest was Period 5 of 2023-24, at 96.7%, and the two are 21.6 percentage points apart. Cancellations peaked at 12.3% of scheduled stops in Period 9 of 2024-25, against 3.6% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Malden Manor on 87.3%. The comparison group includes Chessington South (87.0%), Chessington North (87.9%) and Tolworth (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,404 | 87.3% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Malden Manor? Delay Repay
These operators call at Malden Manor and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,848 | 90.7% | 2.2% |
| Period 6 of 2026-27 | 1,857 | 91.0% | 3.0% |
| Period 5 of 2026-27 | 1,928 | 90.0% | 3.3% |
| Period 4 of 2026-27 | 1,928 | 88.8% | 2.0% |
| Period 3 of 2026-27 | 1,735 | 87.5% | 4.8% |
| Period 2 of 2026-27 | 1,908 | 83.7% | 6.5% |
| Period 1 of 2026-27 | 2,170 | 90.7% | 4.8% |
| Period 13 of 2025-26 | 1,867 | 90.8% | 1.9% |
| Period 12 of 2025-26 | 1,899 | 85.7% | 4.1% |
| Period 11 of 2025-26 | 1,896 | 86.9% | 1.5% |
| Period 10 of 2025-26 | 1,650 | 85.5% | 3.2% |
| Period 9 of 2025-26 | 1,832 | 77.7% | 2.0% |
| Period 8 of 2025-26 | 1,886 | 83.7% | 6.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chessington South | 24,404 | 87.0% | 3.1% |
| Chessington North | 24,405 | 87.9% | 3.4% |
| Tolworth | 24,405 | 85.7% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out