Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Three Bridges

TBDSouth EastManaged by Govia Thameslink Railway (Southern)

On time, last 13 periods72.7%Great Britain: 83.6%
Cancelled5.4%Great Britain: 3.2%
Stops a day362Scheduled, on average
Punctuality rank1998th of 2,374Among ranked stations

How this station is performing

Three Bridges had 131,852 scheduled stops to Period 7 of 2026-27, about 362 a day. 72.7% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.

Three Bridges opened on 12 July 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Three Bridges is the oldest; the next oldest, Horley, dates from 1841.

The nearest stations to Three Bridges are Crawley (1.9 km west), Ifield (3.7 km west), Gatwick Airport (4.3 km north), Horley (5.7 km north) and Balcombe (7.1 km south). 7 stations lie within 10 km in all. Of the five, Ifield is the most punctual at 80.9% and Gatwick Airport the least at 71.6%, with Three Bridges on 72.7%.

Three Bridges takes its name from a suburb called Three Bridges, and the station stands 0.0 km from its centre.

For Three Bridges, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 58.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 83.0%, which is 24.8 percentage points higher.

2 of 3 stations of a similar size in South East are more punctual than Three Bridges on 72.7%. The comparison group includes Guildford (82.1%), Haywards Heath (71.4%) and Barnham (81.6%).

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 83.0%Period 2 of 2023-24: 80.9%Period 3 of 2023-24: 72.3%Period 4 of 2023-24: 70.9%Period 5 of 2023-24: 76.0%Period 6 of 2023-24: 73.0%Period 7 of 2023-24: 69.1%Period 8 of 2023-24: 68.7%Period 9 of 2023-24: 66.6%Period 10 of 2023-24: 69.1%Period 11 of 2023-24: 72.2%Period 12 of 2023-24: 75.4%Period 13 of 2023-24: 77.3%Period 1 of 2024-25: 79.7%Period 2 of 2024-25: 76.9%Period 3 of 2024-25: 73.9%Period 4 of 2024-25: 70.9%Period 5 of 2024-25: 72.9%Period 6 of 2024-25: 70.9%Period 7 of 2024-25: 72.5%Period 8 of 2024-25: 75.5%Period 9 of 2024-25: 66.0%Period 10 of 2024-25: 73.1%Period 11 of 2024-25: 74.2%Period 12 of 2024-25: 73.3%Period 13 of 2024-25: 78.7%Period 1 of 2025-26: 81.9%Period 2 of 2025-26: 78.5%Period 3 of 2025-26: 77.1%Period 4 of 2025-26: 66.6%Period 5 of 2025-26: 74.0%Period 6 of 2025-26: 69.9%Period 7 of 2025-26: 74.7%Period 8 of 2025-26: 73.9%Period 9 of 2025-26: 66.9%Period 10 of 2025-26: 75.2%Period 11 of 2025-26: 76.3%Period 12 of 2025-26: 76.1%Period 13 of 2025-26: 80.9%Period 1 of 2026-27: 82.4%Period 2 of 2026-27: 78.4%Period 3 of 2026-27: 71.8%Period 4 of 2026-27: 68.9%Period 5 of 2026-27: 63.7%Period 6 of 2026-27: 58.2%Period 7 of 2026-27: 68.1%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 6.3%Period 2 of 2023-24: 3.8%Period 3 of 2023-24: 6.2%Period 4 of 2023-24: 4.8%Period 5 of 2023-24: 5.6%Period 6 of 2023-24: 5.7%Period 7 of 2023-24: 6.1%Period 8 of 2023-24: 6.7%Period 9 of 2023-24: 5.6%Period 10 of 2023-24: 9.4%Period 11 of 2023-24: 3.9%Period 12 of 2023-24: 7.5%Period 13 of 2023-24: 5.1%Period 1 of 2024-25: 5.8%Period 2 of 2024-25: 6.4%Period 3 of 2024-25: 8.5%Period 4 of 2024-25: 6.5%Period 5 of 2024-25: 7.5%Period 6 of 2024-25: 8.0%Period 7 of 2024-25: 10.4%Period 8 of 2024-25: 7.8%Period 9 of 2024-25: 10.5%Period 10 of 2024-25: 8.1%Period 11 of 2024-25: 5.1%Period 12 of 2024-25: 5.8%Period 13 of 2024-25: 5.4%Period 1 of 2025-26: 4.0%Period 2 of 2025-26: 3.7%Period 3 of 2025-26: 7.0%Period 4 of 2025-26: 7.1%Period 5 of 2025-26: 10.0%Period 6 of 2025-26: 9.3%Period 7 of 2025-26: 6.6%Period 8 of 2025-26: 4.7%Period 9 of 2025-26: 8.4%Period 10 of 2025-26: 4.7%Period 11 of 2025-26: 4.1%Period 12 of 2025-26: 5.3%Period 13 of 2025-26: 2.2%Period 1 of 2026-27: 4.1%Period 2 of 2026-27: 5.3%Period 3 of 2026-27: 5.9%Period 4 of 2026-27: 8.3%Period 5 of 2026-27: 7.6%Period 6 of 2026-27: 7.1%Period 7 of 2026-27: 3.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR131,85272.7%5.4%

Operators with their own page for this station are linked to it.

Late train at Three Bridges? Delay Repay

These operators call at Three Bridges and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2710,35468.1%3.8%
Period 6 of 2026-279,77158.2%7.1%
Period 5 of 2026-279,76963.7%7.6%
Period 4 of 2026-2710,08168.9%8.3%
Period 3 of 2026-279,42971.8%5.9%
Period 2 of 2026-2710,03278.4%5.3%
Period 1 of 2026-2711,63182.4%4.1%
Period 13 of 2025-2611,33180.9%2.2%
Period 12 of 2025-2610,23176.1%5.3%
Period 11 of 2025-269,92876.3%4.1%
Period 10 of 2025-269,22875.2%4.7%
Period 9 of 2025-269,92666.9%8.4%
Period 8 of 2025-2610,14173.9%4.7%

Time of year

60%70%80%90%P1: 81.9%1P2: 78.6%2P3: 73.9%3P4: 69.3%4P5: 71.5%5P6: 67.9%6P7: 71.1%7P8: 72.7%8P9: 66.5%9P10: 72.5%10P11: 74.3%11P12: 74.9%12P13: 79.1%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Guildford132,09282.1%3.0%
Haywards Heath120,84571.4%5.8%
Barnham120,35381.6%2.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out