Guildford
GLDSouth EastManaged by Network Rail
How this station is performing
Guildford had 132,092 scheduled stops to Period 7 of 2026-27, about 363 a day. 82.1% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Guildford opened on 5 May 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Guildford is the oldest; the next oldest, Shalford (Surrey), dates from 1849.
The nearest stations to Guildford are London Road (Guildford) (1.2 km east), Shalford (Surrey) (2.7 km south), Chilworth (4.6 km south-east), Farncombe (4.7 km south) and Worplesdon (5.6 km north). 13 stations lie within 10 km in all. Of the five, London Road (Guildford) is the most punctual at 86.8% and Shalford (Surrey) the least at 78.7%, with Guildford on 82.1%.
Guildford is one of 2 stations named after a county town called Guildford, home to about 77,057 people; this one stands 0.5 km from its centre.
3 operators call at Guildford: South Western Railway (83.5%, 81% of stops), Great Western Railway (76.1%, 19% of stops) and CrossCountry (–, 0% of stops). The operator you travel with matters: South Western Railway reaches 83.5% within three minutes while Great Western Railway manages 76.1%, a gap of 7.4 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Guildford on 82.1%. The comparison group includes Three Bridges (72.7%), Haywards Heath (71.4%) and Dartford (82.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 106,466 | 83.5% | 2.4% |
| Great Western Railway | 25,528 | 76.1% | 5.6% |
| CrossCountry | 98 | – | – |
Operators with their own page for this station are linked to it.
Late train at Guildford? Delay Repay
These operators call at Guildford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,545 | 80.4% | 2.9% |
| Period 6 of 2026-27 | 10,154 | 81.2% | 2.5% |
| Period 5 of 2026-27 | 9,983 | 80.7% | 3.8% |
| Period 4 of 2026-27 | 10,197 | 83.1% | 3.0% |
| Period 3 of 2026-27 | 9,925 | 84.8% | 4.1% |
| Period 2 of 2026-27 | 10,105 | 81.4% | 5.0% |
| Period 1 of 2026-27 | 11,850 | 87.0% | 2.4% |
| Period 13 of 2025-26 | 11,128 | 87.6% | 1.4% |
| Period 12 of 2025-26 | 10,201 | 85.4% | 2.7% |
| Period 11 of 2025-26 | 10,208 | 84.2% | 2.0% |
| Period 10 of 2025-26 | 9,011 | 77.8% | 3.9% |
| Period 9 of 2025-26 | 9,725 | 73.7% | 2.0% |
| Period 8 of 2025-26 | 10,060 | 77.7% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Three Bridges | 131,852 | 72.7% | 5.4% |
| Haywards Heath | 120,845 | 71.4% | 5.8% |
| Dartford | 144,720 | 82.4% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out