Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Thornton Heath

TTHLondonManaged by Govia Thameslink Railway (Southern)

On time, last 13 periods93.4%Great Britain: 83.6%
Cancelled3.1%Great Britain: 3.2%
Stops a day197Scheduled, on average
Punctuality rank253rd of 2,374Among ranked stations

How this station is performing

Thornton Heath had 71,575 scheduled stops to Period 7 of 2026-27, about 197 a day. 93.4% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.

Thornton Heath opened on 1 December 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Norwood Junction is the oldest (1839) and Norbury the newest (1878), with Thornton Heath in between.

The nearest stations to Thornton Heath are Selhurst (1.2 km south-east), Norwood Junction (1.8 km east), Norbury (2.0 km north-west), West Croydon (2.3 km south) and East Croydon (2.7 km south). 99 stations lie within 10 km in all. Of the five, Norbury is the most punctual at 93.8% and East Croydon the least at 77.5%, with Thornton Heath on 93.4%.

Thornton Heath takes its name from an area of London called Thornton Heath, home to about 65,812 people, and the station stands 0.6 km from its centre.

1 of 3 stations of a similar size in London are more punctual than Thornton Heath on 93.4%. The comparison group includes Norbury (93.8%), Streatham Common (93.2%) and Brent Cross West (74.0%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.2%Period 2 of 2023-24: 96.3%Period 3 of 2023-24: 94.3%Period 4 of 2023-24: 94.3%Period 5 of 2023-24: 97.0%Period 6 of 2023-24: 95.0%Period 7 of 2023-24: 93.7%Period 8 of 2023-24: 93.6%Period 9 of 2023-24: 93.3%Period 10 of 2023-24: 93.5%Period 11 of 2023-24: 93.6%Period 12 of 2023-24: 95.1%Period 13 of 2023-24: 94.5%Period 1 of 2024-25: 96.1%Period 2 of 2024-25: 94.9%Period 3 of 2024-25: 93.6%Period 4 of 2024-25: 95.0%Period 5 of 2024-25: 95.1%Period 6 of 2024-25: 95.9%Period 7 of 2024-25: 91.1%Period 8 of 2024-25: 93.4%Period 9 of 2024-25: 93.3%Period 10 of 2024-25: 96.6%Period 11 of 2024-25: 95.2%Period 12 of 2024-25: 95.2%Period 13 of 2024-25: 95.6%Period 1 of 2025-26: 94.7%Period 2 of 2025-26: 95.6%Period 3 of 2025-26: 93.4%Period 4 of 2025-26: 93.5%Period 5 of 2025-26: 95.0%Period 6 of 2025-26: 94.7%Period 7 of 2025-26: 93.5%Period 8 of 2025-26: 93.3%Period 9 of 2025-26: 93.4%Period 10 of 2025-26: 92.9%Period 11 of 2025-26: 92.6%Period 12 of 2025-26: 94.0%Period 13 of 2025-26: 93.7%Period 1 of 2026-27: 94.8%Period 2 of 2026-27: 94.1%Period 3 of 2026-27: 93.9%Period 4 of 2026-27: 94.1%Period 5 of 2026-27: 89.7%Period 6 of 2026-27: 93.6%Period 7 of 2026-27: 93.4%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.3%Period 2 of 2023-24: 1.5%Period 3 of 2023-24: 2.1%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 1.3%Period 6 of 2023-24: 1.9%Period 7 of 2023-24: 1.0%Period 8 of 2023-24: 1.3%Period 9 of 2023-24: 2.8%Period 10 of 2023-24: 2.0%Period 11 of 2023-24: 2.2%Period 12 of 2023-24: 1.4%Period 13 of 2023-24: 1.8%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 3.8%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 2.7%Period 6 of 2024-25: 2.2%Period 7 of 2024-25: 2.9%Period 8 of 2024-25: 2.5%Period 9 of 2024-25: 2.4%Period 10 of 2024-25: 2.2%Period 11 of 2024-25: 2.1%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 2.0%Period 1 of 2025-26: 1.0%Period 2 of 2025-26: 2.2%Period 3 of 2025-26: 2.8%Period 4 of 2025-26: 2.3%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 3.3%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 3.6%Period 9 of 2025-26: 1.6%Period 10 of 2025-26: 3.0%Period 11 of 2025-26: 1.6%Period 12 of 2025-26: 2.7%Period 13 of 2025-26: 3.7%Period 1 of 2026-27: 1.3%Period 2 of 2026-27: 3.9%Period 3 of 2026-27: 2.9%Period 4 of 2026-27: 3.7%Period 5 of 2026-27: 5.5%Period 6 of 2026-27: 1.9%Period 7 of 2026-27: 4.7%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR71,57593.4%3.1%

Operators with their own page for this station are linked to it.

Late train at Thornton Heath? Delay Repay

These operators call at Thornton Heath and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,41993.4%4.7%
Period 6 of 2026-275,51393.6%1.9%
Period 5 of 2026-275,43489.7%5.5%
Period 4 of 2026-275,57594.1%3.7%
Period 3 of 2026-275,52193.9%2.9%
Period 2 of 2026-275,42194.1%3.9%
Period 1 of 2026-275,92694.8%1.3%
Period 13 of 2025-266,09793.7%3.7%
Period 12 of 2025-265,46094.0%2.7%
Period 11 of 2025-265,48892.6%1.6%
Period 10 of 2025-264,79692.9%3.0%
Period 9 of 2025-265,50093.4%1.6%
Period 8 of 2025-265,42593.3%3.6%

Time of year

80%90%100%P1: 95.4%1P2: 95.2%2P3: 93.8%3P4: 94.2%4P5: 94.2%5P6: 94.8%6P7: 92.9%7P8: 93.4%8P9: 93.3%9P10: 94.4%10P11: 93.8%11P12: 94.8%12P13: 94.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Norbury71,64093.8%3.1%
Streatham Common71,71993.2%3.0%
Brent Cross West71,10674.0%7.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out