Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Norbury

NRBLondonManaged by Govia Thameslink Railway (Southern)

On time, last 13 periods93.8%Great Britain: 83.6%
Cancelled3.1%Great Britain: 3.2%
Stops a day197Scheduled, on average
Punctuality rank229th of 2,374Among ranked stations

How this station is performing

Norbury had 71,640 scheduled stops to Period 7 of 2026-27, about 197 a day. 93.8% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.

Norbury opened on 1 January 1878, 148 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, West Norwood is the oldest (1856) and Mitcham Eastfields the newest (2008), with Norbury in between.

The nearest stations to Norbury are Streatham Common (1.3 km north-west), Streatham (Greater London) (1.7 km north-west), Thornton Heath (2.0 km south-east), Mitcham Eastfields (2.3 km west) and West Norwood (2.6 km north-east). 104 stations lie within 10 km in all. Of the five, West Norwood is the most punctual at 95.1% and Streatham (Greater London) the least at 87.6%, with Norbury on 93.8%.

Norbury is one of 6 stations named after an area of London called Norbury, home to about 16,476 people; this one stands 1.0 km from its centre.

Compared with 3 stations of a similar size in London, Norbury is the most punctual, at 93.8%. The comparison group includes Thornton Heath (93.4%), Streatham Common (93.2%) and Brent Cross West (74.0%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.3%Period 2 of 2023-24: 96.8%Period 3 of 2023-24: 94.7%Period 4 of 2023-24: 94.8%Period 5 of 2023-24: 97.5%Period 6 of 2023-24: 95.2%Period 7 of 2023-24: 94.2%Period 8 of 2023-24: 94.1%Period 9 of 2023-24: 94.0%Period 10 of 2023-24: 94.0%Period 11 of 2023-24: 94.0%Period 12 of 2023-24: 95.3%Period 13 of 2023-24: 95.4%Period 1 of 2024-25: 96.5%Period 2 of 2024-25: 95.2%Period 3 of 2024-25: 93.8%Period 4 of 2024-25: 95.3%Period 5 of 2024-25: 95.5%Period 6 of 2024-25: 96.1%Period 7 of 2024-25: 92.2%Period 8 of 2024-25: 94.5%Period 9 of 2024-25: 93.9%Period 10 of 2024-25: 96.8%Period 11 of 2024-25: 95.5%Period 12 of 2024-25: 95.5%Period 13 of 2024-25: 95.9%Period 1 of 2025-26: 95.1%Period 2 of 2025-26: 95.7%Period 3 of 2025-26: 94.0%Period 4 of 2025-26: 94.1%Period 5 of 2025-26: 95.3%Period 6 of 2025-26: 95.4%Period 7 of 2025-26: 93.9%Period 8 of 2025-26: 93.8%Period 9 of 2025-26: 93.9%Period 10 of 2025-26: 93.0%Period 11 of 2025-26: 93.1%Period 12 of 2025-26: 94.6%Period 13 of 2025-26: 94.3%Period 1 of 2026-27: 95.3%Period 2 of 2026-27: 94.4%Period 3 of 2026-27: 94.0%Period 4 of 2026-27: 94.4%Period 5 of 2026-27: 91.8%Period 6 of 2026-27: 93.6%Period 7 of 2026-27: 93.4%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.3%Period 2 of 2023-24: 1.5%Period 3 of 2023-24: 2.0%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 1.2%Period 6 of 2023-24: 1.9%Period 7 of 2023-24: 1.0%Period 8 of 2023-24: 1.3%Period 9 of 2023-24: 2.8%Period 10 of 2023-24: 2.0%Period 11 of 2023-24: 1.7%Period 12 of 2023-24: 1.4%Period 13 of 2023-24: 1.9%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 3.8%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 2.7%Period 6 of 2024-25: 2.2%Period 7 of 2024-25: 2.7%Period 8 of 2024-25: 2.5%Period 9 of 2024-25: 2.4%Period 10 of 2024-25: 2.2%Period 11 of 2024-25: 2.1%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 2.0%Period 1 of 2025-26: 1.0%Period 2 of 2025-26: 2.2%Period 3 of 2025-26: 2.8%Period 4 of 2025-26: 2.3%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 3.3%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 3.5%Period 9 of 2025-26: 1.7%Period 10 of 2025-26: 2.8%Period 11 of 2025-26: 1.7%Period 12 of 2025-26: 2.7%Period 13 of 2025-26: 3.7%Period 1 of 2026-27: 1.3%Period 2 of 2026-27: 3.9%Period 3 of 2026-27: 2.9%Period 4 of 2026-27: 3.7%Period 5 of 2026-27: 5.5%Period 6 of 2026-27: 1.8%Period 7 of 2026-27: 4.7%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR71,64093.8%3.1%

Operators with their own page for this station are linked to it.

Late train at Norbury? Delay Repay

These operators call at Norbury and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,41993.4%4.7%
Period 6 of 2026-275,51393.6%1.8%
Period 5 of 2026-275,43491.8%5.5%
Period 4 of 2026-275,57694.4%3.7%
Period 3 of 2026-275,52194.0%2.9%
Period 2 of 2026-275,42194.4%3.9%
Period 1 of 2026-275,92695.3%1.3%
Period 13 of 2025-266,09794.3%3.7%
Period 12 of 2025-265,46094.6%2.7%
Period 11 of 2025-265,48893.1%1.7%
Period 10 of 2025-264,82893.0%2.8%
Period 9 of 2025-265,53293.9%1.7%
Period 8 of 2025-265,42593.8%3.5%

Time of year

80%90%100%P1: 95.8%1P2: 95.5%2P3: 94.1%3P4: 94.6%4P5: 95.0%5P6: 95.1%6P7: 93.4%7P8: 94.1%8P9: 93.9%9P10: 94.6%10P11: 94.2%11P12: 95.1%12P13: 95.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Thornton Heath71,57593.4%3.1%
Streatham Common71,71993.2%3.0%
Brent Cross West71,10674.0%7.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out