Teddington
TEDLondonManaged by South Western Railway
How this station is performing
Teddington had 50,344 scheduled stops to Period 7 of 2026-27, about 138 a day. 88.0% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Teddington opened on 1 July 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hampton Court is the oldest (1849) and Strawberry Hill the newest (1873), with Teddington in between.
The nearest stations to Teddington are Fulwell (1.5 km north-west), Strawberry Hill (1.7 km north), Hampton Wick (1.8 km south-east), Kingston (2.5 km south-east) and Hampton Court (2.6 km south). 58 stations lie within 10 km in all. Of the five, Hampton Wick is the most punctual at 88.3% and Kingston the least at 85.1%, with Teddington on 88.0%.
Teddington is one of 2 stations named after an area of London called Teddington, home to about 10,562 people; this one stands 0.0 km from its centre.
Across the whole run of data, the weakest four-week period for Teddington was Period 9 of 2024-25, at 64.9%, some time before the latest year. The strongest was Period 5 of 2023-24, at 95.7%, and the two are 30.8 percentage points apart. Cancellations peaked at 11.4% of scheduled stops in Period 1 of 2025-26, against 4.4% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Teddington on 88.0%. The comparison group includes South Croydon (83.0%), Mitcham Eastfields (88.6%) and Mitcham Junction (88.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 50,344 | 88.0% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Teddington? Delay Repay
These operators call at Teddington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,851 | 90.9% | 3.1% |
| Period 6 of 2026-27 | 3,978 | 91.3% | 4.2% |
| Period 5 of 2026-27 | 3,943 | 88.7% | 2.6% |
| Period 4 of 2026-27 | 3,864 | 90.4% | 2.2% |
| Period 3 of 2026-27 | 3,773 | 88.5% | 7.9% |
| Period 2 of 2026-27 | 4,014 | 84.3% | 7.5% |
| Period 1 of 2026-27 | 4,436 | 91.5% | 2.9% |
| Period 13 of 2025-26 | 4,057 | 92.1% | 1.9% |
| Period 12 of 2025-26 | 3,338 | 87.0% | 7.7% |
| Period 11 of 2025-26 | 3,978 | 89.3% | 2.4% |
| Period 10 of 2025-26 | 3,562 | 88.0% | 5.0% |
| Period 9 of 2025-26 | 3,941 | 78.2% | 3.5% |
| Period 8 of 2025-26 | 3,609 | 82.0% | 6.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Croydon | 50,313 | 83.0% | 5.0% |
| Mitcham Eastfields | 50,482 | 88.6% | 5.3% |
| Mitcham Junction | 50,556 | 88.6% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out