South Croydon
SCYLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
South Croydon had 50,313 scheduled stops to Period 7 of 2026-27, about 138 a day. 83.0% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
South Croydon opened on 1 September 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, West Croydon is the oldest (1839) and Purley Oaks the newest (1899), with South Croydon in between.
The nearest stations to South Croydon are East Croydon (1.4 km north), Sanderstead (1.6 km south), Waddon (1.7 km west), Purley Oaks (1.8 km south) and West Croydon (1.8 km north). 72 stations lie within 10 km in all. Of the five, Waddon is the most punctual at 90.9% and East Croydon the least at 77.5%, with South Croydon on 83.0%.
South Croydon takes its name from an area of London called South Croydon, home to about 15,790 people, and the station stands 1.1 km from its centre.
Compared with 3 stations of a similar size in London, South Croydon is the least punctual, at 83.0%. All of them are ahead, including Teddington (88.0%), Mitcham Eastfields (88.6%) and Mitcham Junction (88.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 50,313 | 83.0% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at South Croydon? Delay Repay
These operators call at South Croydon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,880 | 82.0% | 3.1% |
| Period 6 of 2026-27 | 3,834 | 81.1% | 6.9% |
| Period 5 of 2026-27 | 3,707 | 80.7% | 6.4% |
| Period 4 of 2026-27 | 3,874 | 80.4% | 7.4% |
| Period 3 of 2026-27 | 3,503 | 81.6% | 2.9% |
| Period 2 of 2026-27 | 3,793 | 88.0% | 2.4% |
| Period 1 of 2026-27 | 4,385 | 87.9% | 3.2% |
| Period 13 of 2025-26 | 4,284 | 87.6% | 2.4% |
| Period 12 of 2025-26 | 3,892 | 80.8% | 8.1% |
| Period 11 of 2025-26 | 4,026 | 81.1% | 4.2% |
| Period 10 of 2025-26 | 3,365 | 84.3% | 5.4% |
| Period 9 of 2025-26 | 3,875 | 79.4% | 10.1% |
| Period 8 of 2025-26 | 3,895 | 82.5% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Teddington | 50,344 | 88.0% | 4.4% |
| Mitcham Eastfields | 50,482 | 88.6% | 5.3% |
| Mitcham Junction | 50,556 | 88.6% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out