Mitcham Junction
MIJLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Mitcham Junction had 50,556 scheduled stops to Period 7 of 2026-27, about 139 a day. 88.6% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Mitcham Junction opened on 1 October 1868, 158 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Mitcham Junction is the oldest; the next oldest, Hackbridge, dates from 1868.
The nearest stations to Mitcham Junction are Hackbridge (1.6 km south), Mitcham Eastfields (1.7 km north), Carshalton (2.8 km south), St Helier (London) (2.9 km west) and Morden South (2.9 km west). 88 stations lie within 10 km in all. At 88.6%, Mitcham Junction is more punctual than every one of them; the best of the five, Mitcham Eastfields, manages 88.6%.
Mitcham Junction is named after Mitcham, an area of London, home to about 63,393 people, but the station stands 1.0 km from its centre.
Cancellations are a particular problem at Mitcham Junction. 5.4% of scheduled stops did not happen, 2.0 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2181st of 2,374.
Compared with 3 stations of a similar size in London, Mitcham Junction is the most punctual, at 88.6%. The comparison group includes Hackbridge (87.8%), Mitcham Eastfields (88.6%) and Teddington (88.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 50,556 | 88.6% | 5.4% |
Operators with their own page for this station are linked to it.
Late train at Mitcham Junction? Delay Repay
These operators call at Mitcham Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,908 | 89.2% | 5.9% |
| Period 6 of 2026-27 | 3,961 | 88.3% | 6.5% |
| Period 5 of 2026-27 | 3,915 | 86.3% | 7.3% |
| Period 4 of 2026-27 | 3,899 | 89.4% | 3.9% |
| Period 3 of 2026-27 | 3,718 | 86.5% | 6.1% |
| Period 2 of 2026-27 | 3,622 | 88.6% | 3.1% |
| Period 1 of 2026-27 | 4,308 | 89.7% | 4.2% |
| Period 13 of 2025-26 | 4,245 | 91.3% | 5.1% |
| Period 12 of 2025-26 | 4,027 | 89.6% | 3.7% |
| Period 11 of 2025-26 | 3,945 | 86.8% | 4.8% |
| Period 10 of 2025-26 | 3,233 | 90.7% | 7.6% |
| Period 9 of 2025-26 | 3,916 | 87.1% | 8.0% |
| Period 8 of 2025-26 | 3,859 | 88.2% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hackbridge | 50,558 | 87.8% | 5.4% |
| Mitcham Eastfields | 50,482 | 88.6% | 5.3% |
| Teddington | 50,344 | 88.0% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out