Taunton
TAUSouth WestManaged by Great Western Railway
How this station is performing
Taunton had 45,109 scheduled stops to Period 7 of 2026-27, about 124 a day. 59.2% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Taunton opened on 1 July 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bridgwater is the oldest (1841) and Tiverton Parkway the newest (1928), with Taunton in between.
Taunton is remote: its nearest neighbours are Bridgwater (14.0 km north-east), Tiverton Parkway (21.5 km south-west), Highbridge and Burnham (23.5 km north-east), Honiton (25.9 km south) and Axminster (28.0 km south). Of the five, Highbridge and Burnham is the most punctual at 72.8% and Tiverton Parkway the least at 57.1%, with Taunton on 59.2%.
Taunton takes its name from a county town called Taunton, home to about 60,479 people, and the station stands 0.5 km from its centre.
2 operators call at Taunton: Great Western Railway (58.9%, 72% of stops) and CrossCountry (60.0%, 28% of stops). They are close together, with CrossCountry leading on 60.0% and Great Western Railway trailing on 58.9%, a gap of 1.1 percentage points.
Compared with 3 stations of a similar size in South West, Taunton is the least punctual, at 59.2%. All of them are ahead, including Plymouth (69.5%), Truro (74.9%) and Westbury (69.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 32,494 | 58.9% | 2.6% |
| CrossCountry | 12,615 | 60.0% | 7.0% |
Operators with their own page for this station are linked to it.
Late train at Taunton? Delay Repay
These operators call at Taunton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,383 | 65.0% | 4.3% |
| Period 6 of 2026-27 | 3,515 | 51.0% | 4.0% |
| Period 5 of 2026-27 | 3,496 | 48.2% | 5.1% |
| Period 4 of 2026-27 | 3,502 | 53.8% | 3.4% |
| Period 3 of 2026-27 | 3,456 | 56.8% | 3.6% |
| Period 2 of 2026-27 | 3,471 | 61.1% | 2.8% |
| Period 1 of 2026-27 | 3,895 | 68.4% | 1.4% |
| Period 13 of 2025-26 | 3,685 | 70.2% | 1.7% |
| Period 12 of 2025-26 | 3,349 | 76.6% | 1.5% |
| Period 11 of 2025-26 | 3,416 | 70.7% | 7.3% |
| Period 10 of 2025-26 | 3,024 | 53.0% | 6.7% |
| Period 9 of 2025-26 | 3,500 | 44.0% | 5.4% |
| Period 8 of 2025-26 | 3,417 | 48.5% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out