Plymouth
PLYSouth WestManaged by Great Western Railway
How this station is performing
Plymouth had 45,610 scheduled stops to Period 7 of 2026-27, about 125 a day. 69.5% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Plymouth opened on 28 March 1877, 149 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Devonport is the oldest (1859) and Dockyard (Devonport) the newest (1905), with Plymouth in between.
The nearest stations to Plymouth are Devonport (1.9 km west), Dockyard (Devonport) (2.4 km west), Keyham (2.9 km north-west), St Budeaux Ferry Road (4.0 km north-west) and St Budeaux Victoria Road (4.2 km north-west). 7 stations lie within 10 km in all. At 69.5%, Plymouth is less punctual than all of them; the best of the five, St Budeaux Victoria Road, manages 83.5%.
Plymouth takes its name from a big city called Plymouth, home to about 267,918 people, and the station stands 0.8 km from its centre.
2 operators call at Plymouth: Great Western Railway (69.4%, 77% of stops) and CrossCountry (69.8%, 23% of stops). They are close together, with CrossCountry leading on 69.8% and Great Western Railway trailing on 69.4%, a gap of 0.4 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Plymouth on 69.5%. The comparison group includes Taunton (59.2%), Truro (74.9%) and Westbury (69.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 35,159 | 69.4% | 4.0% |
| CrossCountry | 10,451 | 69.8% | 7.5% |
Operators with their own page for this station are linked to it.
Late train at Plymouth? Delay Repay
These operators call at Plymouth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,393 | 75.7% | 2.5% |
| Period 6 of 2026-27 | 3,536 | 67.1% | 7.1% |
| Period 5 of 2026-27 | 3,622 | 62.0% | 8.2% |
| Period 4 of 2026-27 | 3,604 | 62.1% | 6.2% |
| Period 3 of 2026-27 | 3,589 | 66.7% | 5.6% |
| Period 2 of 2026-27 | 3,549 | 70.2% | 3.7% |
| Period 1 of 2026-27 | 4,021 | 76.2% | 1.6% |
| Period 13 of 2025-26 | 3,493 | 79.3% | 2.7% |
| Period 12 of 2025-26 | 3,130 | 80.7% | 2.1% |
| Period 11 of 2025-26 | 3,508 | 71.3% | 9.3% |
| Period 10 of 2025-26 | 3,150 | 65.3% | 6.1% |
| Period 9 of 2025-26 | 3,532 | 59.4% | 4.6% |
| Period 8 of 2025-26 | 3,483 | 66.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out