CrossCountry at Taunton
How this operator is doing here
CrossCountry had 12,615 scheduled stops at Taunton in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 60.0% of recorded arrivals came within three minutes and 7.0% of stops were cancelled.
CrossCountry trains at Taunton also serve Tiverton Parkway (21.5 km south-west, 57.1% on time, 7.1% cancelled), Weston-Super-Mare (36.9 km north, 55.9% on time, 16.3% cancelled), Exeter St David's (45.0 km south-west, 66.9% on time, 7.3% cancelled), Cardiff Central (50.6 km north, 74.6% on time, 17.6% cancelled), Dawlish Warren (53.0 km south-west, – on time, – cancelled) and Dawlish (55.4 km south-west, 52.2% on time, 17.3% cancelled), which are the stations on its network closest to Taunton.
The busiest CrossCountry station within 30 km of Taunton is Tiverton Parkway, 21.5 km south-west, with about 35 scheduled stops a day.
Of the 2 operators with enough records at Taunton, CrossCountry is the most punctual, at 60.0%.
For CrossCountry, Taunton is the 63rd best of 99 ranked stations. Its 60.0% here is 3.2 percentage points below the 63.2% across the whole network.
CrossCountry at Taunton has slipped sharply. 60.0% of stops came within three minutes of the timetable in the latest 13 periods, 8.1 percentage points worse than the 68.1% recorded in the 13 before. Cancellations rose to 7.0% of scheduled stops from 5.0%, which is 2.0 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 936 | 60.0% | 8.5% |
| Period 6 of 2026-27 | 980 | 48.6% | 9.6% |
| Period 5 of 2026-27 | 977 | 47.1% | 7.5% |
| Period 4 of 2026-27 | 970 | 55.1% | 5.7% |
| Period 3 of 2026-27 | 950 | 56.5% | 3.9% |
| Period 2 of 2026-27 | 974 | 58.3% | 4.9% |
| Period 1 of 2026-27 | 1,096 | 69.2% | 2.8% |
| Period 13 of 2025-26 | 1,033 | 68.7% | 2.6% |
| Period 12 of 2025-26 | 942 | 78.1% | 4.8% |
| Period 11 of 2025-26 | 969 | 72.2% | 10.9% |
| Period 10 of 2025-26 | 881 | 56.3% | 15.0% |
| Period 9 of 2025-26 | 980 | 49.7% | 10.5% |
| Period 8 of 2025-26 | 927 | 56.7% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Taunton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 32,494 | 58.9% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out