Tadworth
TADSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Tadworth had 24,061 scheduled stops to Period 7 of 2026-27, about 66 a day. 85.9% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Tadworth opened on 1 July 1900, 126 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Epsom Downs is the oldest (1865) and Tattenham Corner the newest (1901), with Tadworth in between.
The nearest stations to Tadworth are Kingswood (1.7 km east), Tattenham Corner (2.0 km north), Epsom Downs (3.6 km north), Banstead (4.5 km north) and Chipstead (5.0 km north-east). 36 stations lie within 10 km in all. Of the five, Epsom Downs is the most punctual at 92.6% and Kingswood the least at 84.4%, with Tadworth on 85.9%.
Tadworth takes its name from a Village called Tadworth, home to about 9,522 people, and the station stands 0.5 km from its centre.
Tadworth has slipped a little, from 90.3% within three minutes in the previous 13 periods to 85.9% in the latest 13, a fall of 4.4 percentage points. Cancellations held steady at 2.9% of scheduled stops, against 2.5% before.
2 of 3 stations of a similar size in South East are more punctual than Tadworth on 85.9%. The comparison group includes Kingswood (84.4%), Bourne End (92.6%) and Henley-on-Thames (98.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 24,061 | 85.9% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Tadworth? Delay Repay
These operators call at Tadworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,821 | 85.3% | 2.5% |
| Period 6 of 2026-27 | 1,839 | 84.3% | 3.3% |
| Period 5 of 2026-27 | 1,860 | 85.5% | 3.4% |
| Period 4 of 2026-27 | 1,817 | 80.4% | 3.4% |
| Period 3 of 2026-27 | 1,805 | 83.1% | 3.4% |
| Period 2 of 2026-27 | 1,860 | 89.3% | 3.0% |
| Period 1 of 2026-27 | 2,144 | 90.6% | 2.4% |
| Period 13 of 2025-26 | 2,014 | 90.5% | 1.8% |
| Period 12 of 2025-26 | 1,824 | 83.9% | 3.5% |
| Period 11 of 2025-26 | 1,752 | 82.4% | 3.9% |
| Period 10 of 2025-26 | 1,611 | 87.5% | 2.4% |
| Period 9 of 2025-26 | 1,852 | 84.1% | 3.5% |
| Period 8 of 2025-26 | 1,862 | 87.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kingswood | 24,061 | 84.4% | 2.9% |
| Bourne End | 24,077 | 92.6% | 2.3% |
| Henley-on-Thames | 24,084 | 98.1% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out