Bourne End
BNESouth EastManaged by Great Western Railway
How this station is performing
Bourne End had 24,077 scheduled stops to Period 7 of 2026-27, about 66 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Bourne End opened on 1 August 1854, 172 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Taplow is the oldest (1838) and Furze Platt the newest (1937), with Bourne End in between.
The nearest stations to Bourne End are Cookham (2.3 km south), Marlow (3.9 km west), Furze Platt (5.0 km south), Beaconsfield (6.0 km north-east) and Taplow (6.3 km south). 9 stations lie within 10 km in all. Of the five, Marlow is the most punctual at 95.7% and Taplow the least at 82.7%, with Bourne End on 92.6%.
Bourne End is one of 2 stations named after a Village called Bourne End, home to about 5,320 people; this one stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Bourne End was Period 9 of 2024-25, at 85.4%, some time before the latest year. The strongest was Period 5 of 2025-26, at 98.0%, and the two are 12.6 percentage points apart. Cancellations peaked at 5.7% of scheduled stops in Period 2 of 2025-26, against 2.3% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Bourne End on 92.6%. The comparison group includes Henley-on-Thames (98.1%), Kingswood (84.4%) and Tadworth (85.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 24,077 | 92.6% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Bourne End? Delay Repay
These operators call at Bourne End and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,856 | 94.3% | 1.3% |
| Period 6 of 2026-27 | 1,856 | 91.1% | 2.7% |
| Period 5 of 2026-27 | 1,856 | 88.9% | 2.8% |
| Period 4 of 2026-27 | 1,856 | 89.4% | 2.5% |
| Period 3 of 2026-27 | 1,856 | 94.3% | 5.5% |
| Period 2 of 2026-27 | 1,814 | 92.2% | 2.9% |
| Period 1 of 2026-27 | 2,049 | 94.8% | 2.0% |
| Period 13 of 2025-26 | 2,044 | 93.5% | 2.5% |
| Period 12 of 2025-26 | 1,856 | 93.1% | 0.6% |
| Period 11 of 2025-26 | 1,856 | 95.9% | 2.3% |
| Period 10 of 2025-26 | 1,466 | 92.4% | 1.4% |
| Period 9 of 2025-26 | 1,856 | 90.4% | 1.3% |
| Period 8 of 2025-26 | 1,856 | 93.3% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Henley-on-Thames | 24,084 | 98.1% | 1.0% |
| Kingswood | 24,061 | 84.4% | 2.9% |
| Tadworth | 24,061 | 85.9% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out