Henley-on-Thames
HOTSouth EastManaged by Great Western Railway
How this station is performing
Henley-on-Thames had 24,084 scheduled stops to Period 7 of 2026-27, about 66 a day. 98.1% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Henley-on-Thames opened on 1 June 1857, 169 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Twyford is the oldest (1839) and Wargrave the newest (1900), with Henley-on-Thames in between.
The nearest stations to Henley-on-Thames are Shiplake (2.8 km south-east), Wargrave (4.3 km south), Twyford (7.0 km south), Reading (9.7 km south-west) and Marlow (10.1 km north-east). 4 stations lie within 10 km in all. At 98.1%, Henley-on-Thames is more punctual than every one of them; the best of the five, Wargrave, manages 98.0%.
Henley-on-Thames takes its name from a market town called Henley-on-Thames, home to about 11,619 people, and the station stands 0.3 km from its centre.
Henley-on-Thames is among the most punctual stations in Britain. Its 98.1% puts it 14th out of 2,374 ranked stations, with 13 ahead of it and 2,360 behind, and 14.2 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in South East, Henley-on-Thames is the most punctual, at 98.1%. The comparison group includes Bourne End (92.6%), Kingswood (84.4%) and Tadworth (85.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 24,084 | 98.1% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Henley-on-Thames? Delay Repay
These operators call at Henley-on-Thames and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,840 | 99.0% | 0.8% |
| Period 6 of 2026-27 | 1,840 | 97.1% | 2.2% |
| Period 5 of 2026-27 | 1,840 | 97.9% | 1.4% |
| Period 4 of 2026-27 | 1,722 | 95.8% | 1.1% |
| Period 3 of 2026-27 | 1,840 | 98.9% | 1.1% |
| Period 2 of 2026-27 | 1,840 | 98.6% | 0.8% |
| Period 1 of 2026-27 | 2,111 | 98.9% | 0.4% |
| Period 13 of 2025-26 | 2,029 | 98.4% | 0.4% |
| Period 12 of 2025-26 | 1,840 | 97.6% | 0.2% |
| Period 11 of 2025-26 | 1,840 | 98.6% | 1.3% |
| Period 10 of 2025-26 | 1,662 | 98.6% | 1.3% |
| Period 9 of 2025-26 | 1,840 | 97.5% | 1.4% |
| Period 8 of 2025-26 | 1,840 | 98.2% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bourne End | 24,077 | 92.6% | 2.3% |
| Kingswood | 24,061 | 84.4% | 2.9% |
| Tadworth | 24,061 | 85.9% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out