Swansea
SWAWalesManaged by TfW Rail
How this station is performing
Swansea had 38,654 scheduled stops to Period 7 of 2026-27, about 106 a day. 69.0% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Swansea opened on 19 June 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Swansea is the oldest; the next oldest, Llansamlet, dates from 1852.
The nearest stations to Swansea are Llansamlet (5.5 km north-east), Gowerton (7.0 km west), Skewen (7.6 km north-east), Briton Ferry (8.4 km east) and Baglan (9.1 km east). 5 stations lie within 10 km in all. At 69.0%, Swansea is more punctual than every one of them; the best of the five, Gowerton, manages 69.0%.
Swansea takes its name from a city called Swansea, home to about 246,700 people, and the station stands 1.2 km from its centre.
2 operators call at Swansea: Transport for Wales (72.1%, 62% of stops) and Great Western Railway (64.0%, 38% of stops). The operator you travel with matters: Transport for Wales reaches 72.1% within three minutes while Great Western Railway manages 64.0%, a gap of 8.1 percentage points.
Compared with 3 stations of a similar size in Wales, Swansea is the least punctual, at 69.0%. All of them are ahead, including Penarth (96.1%), Aber (93.0%) and Llanbradach (91.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 23,919 | 72.1% | 2.9% |
| Great Western Railway | 14,735 | 64.0% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Swansea? Delay Repay
These operators call at Swansea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,084 | 69.6% | 2.8% |
| Period 6 of 2026-27 | 3,119 | 68.6% | 2.5% |
| Period 5 of 2026-27 | 2,970 | 61.9% | 4.4% |
| Period 4 of 2026-27 | 2,951 | 66.2% | 4.1% |
| Period 3 of 2026-27 | 3,031 | 70.4% | 2.9% |
| Period 2 of 2026-27 | 2,982 | 71.1% | 2.0% |
| Period 1 of 2026-27 | 3,494 | 73.5% | 2.2% |
| Period 13 of 2025-26 | 3,332 | 76.5% | 1.1% |
| Period 12 of 2025-26 | 2,736 | 78.5% | 1.5% |
| Period 11 of 2025-26 | 2,334 | 76.0% | 1.8% |
| Period 10 of 2025-26 | 2,741 | 67.2% | 3.6% |
| Period 9 of 2025-26 | 2,972 | 53.7% | 3.8% |
| Period 8 of 2025-26 | 2,908 | 63.8% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Penarth | 38,522 | 96.1% | 3.2% |
| Aber | 37,329 | 93.0% | 4.4% |
| Llanbradach | 37,329 | 91.2% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out