Aber
ABEWalesManaged by TfW Rail
How this station is performing
Aber has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 37,329 scheduled stops, about 103 a day. In those periods 93.0% of stops arrived within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Aber opened on 1 April 1908, 118 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Taffs Well is the oldest (1840) and Energlyn and Churchill Park the newest (2013), with Aber in between.
The nearest stations to Aber are Caerphilly (0.8 km south-east), Energlyn and Churchill Park (1.1 km north), Llanbradach (3.3 km north), Trefforest Estate (4.2 km west) and Taffs Well (4.4 km south-west). 24 stations lie within 10 km in all. Of the five, Caerphilly is the most punctual at 93.5% and Llanbradach the least at 91.2%, with Aber on 93.0%.
Aber improved sharply over the past year. In the latest 13 periods 93.0% of stops came within three minutes of the timetable, up 7.3 percentage points from 85.7% in the 13 before. Cancellations fell to 4.4% of scheduled stops from 5.0%, which is 0.6 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Aber is the most punctual, at 93.0%. The comparison group includes Llanbradach (91.2%), Ystrad Mynach (90.9%) and Bargoed (91.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 37,329 | 93.0% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Aber? Delay Repay
These operators call at Aber and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,967 | 91.4% | 2.6% |
| Period 6 of 2026-27 | 3,073 | 93.4% | 3.6% |
| Period 5 of 2026-27 | 2,856 | 92.1% | 5.5% |
| Period 4 of 2026-27 | 2,874 | – | 5.2% |
| Period 3 of 2026-27 | 2,962 | 94.9% | 3.3% |
| Period 2 of 2026-27 | 2,849 | 93.9% | 6.3% |
| Period 1 of 2026-27 | 3,471 | 95.5% | 4.6% |
| Period 13 of 2025-26 | 3,274 | 95.1% | 5.0% |
| Period 12 of 2025-26 | 2,253 | 96.1% | 2.2% |
| Period 11 of 2025-26 | 2,953 | 95.4% | 3.3% |
| Period 10 of 2025-26 | 2,620 | 91.3% | 4.7% |
| Period 9 of 2025-26 | 2,853 | 86.0% | 6.8% |
| Period 8 of 2025-26 | 2,324 | 88.7% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llanbradach | 37,329 | 91.2% | 4.5% |
| Ystrad Mynach | 37,329 | 90.9% | 3.9% |
| Bargoed | 37,054 | 91.3% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out