Great Western Railway at Swansea
All trains at SwanseaGreat Western Railway across BritainWales
How this operator is doing here
Great Western Railway had 14,735 scheduled stops at Swansea in the 13 periods to Period 7 of 2026-27, 38% of the station's total. 64.0% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Great Western Railway trains at Swansea also serve Neath (10.0 km north-east, 63.3% on time, 2.3% cancelled), Port Talbot Parkway (11.6 km east, 62.4% on time, 2.3% cancelled), Llanelli (16.1 km west, 76.0% on time, 6.0% cancelled), Pembrey and Burry Port (22.3 km west, 76.6% on time, 6.0% cancelled), Bridgend (28.5 km south-east, 61.2% on time, 2.2% cancelled) and Kidwelly (28.6 km north-west, – on time, – cancelled), which are the stations on its network closest to Swansea.
Within 30 km of here, Great Western Railway runs best at Pembrey and Burry Port, 22.3 km west (76.6%), and worst at Bridgend, 28.5 km south-east (61.2%).
The busiest Great Western Railway station within 30 km of Swansea is Port Talbot Parkway, 11.6 km east, with about 41 scheduled stops a day.
Of the 2 operators with enough records at Swansea, Great Western Railway is the least punctual, at 64.0%.
Great Western Railway at Swansea has slipped a little, from 66.5% within three minutes in the previous 13 periods to 64.0% in the latest 13, a fall of 2.5 percentage points. Cancellations fell to 2.5% of scheduled stops from 3.3%, which is 0.8 percentage points fewer.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,196 | 66.1% | 2.9% |
| Period 6 of 2026-27 | 1,183 | 61.6% | 2.9% |
| Period 5 of 2026-27 | 1,119 | 53.9% | 4.0% |
| Period 4 of 2026-27 | 1,069 | 62.6% | 1.2% |
| Period 3 of 2026-27 | 1,145 | 66.0% | 2.6% |
| Period 2 of 2026-27 | 1,137 | 66.8% | 1.6% |
| Period 1 of 2026-27 | 1,357 | 70.9% | 2.1% |
| Period 13 of 2025-26 | 1,266 | 69.5% | 0.6% |
| Period 12 of 2025-26 | 976 | 73.0% | 1.4% |
| Period 11 of 2025-26 | 913 | 68.5% | 1.1% |
| Period 10 of 2025-26 | 1,024 | 60.9% | 4.0% |
| Period 9 of 2025-26 | 1,177 | 51.2% | 5.3% |
| Period 8 of 2025-26 | 1,173 | 60.9% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Swansea
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 23,919 | 72.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out