Penarth
PENWalesManaged by TfW Rail
How this station is performing
Penarth had 38,522 scheduled stops to Period 7 of 2026-27, about 106 a day. 96.1% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Penarth opened on 20 February 1878, 148 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Cardiff Bay is the oldest (1844) and Eastbrook the newest (1986), with Penarth in between.
The nearest stations to Penarth are Dingle Road (0.6 km north-west), Cogan (1.5 km north-west), Eastbrook (2.2 km west), Dinas Powys (3.1 km west) and Cardiff Bay (3.6 km north). 24 stations lie within 10 km in all. At 96.1%, Penarth is more punctual than every one of them; the best of the five, Cardiff Bay, manages 95.7%.
Penarth is one of 2 stations named after a town called Penarth, home to about 22,595 people; this one stands 0.0 km from its centre.
Penarth is among the most punctual stations in Britain. Its 96.1% puts it 72nd out of 2,374 ranked stations, with 71 ahead of it and 2,302 behind, and 12.2 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Wales, Penarth is the most punctual, at 96.1%. The comparison group includes Swansea (69.0%), Aber (93.0%) and Llanbradach (91.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 38,522 | 96.1% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Penarth? Delay Repay
These operators call at Penarth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,902 | 96.4% | 6.0% |
| Period 6 of 2026-27 | 2,976 | 95.4% | 2.7% |
| Period 5 of 2026-27 | 2,910 | 95.3% | 4.2% |
| Period 4 of 2026-27 | 2,927 | 95.2% | 3.1% |
| Period 3 of 2026-27 | 2,724 | 96.1% | 3.3% |
| Period 2 of 2026-27 | 2,903 | 96.7% | 6.3% |
| Period 1 of 2026-27 | 3,518 | 96.5% | 3.5% |
| Period 13 of 2025-26 | 3,300 | 98.2% | 0.5% |
| Period 12 of 2025-26 | 2,746 | 98.1% | 1.3% |
| Period 11 of 2025-26 | 2,966 | 97.8% | 2.0% |
| Period 10 of 2025-26 | 2,650 | 96.4% | 3.4% |
| Period 9 of 2025-26 | 2,976 | 92.1% | 3.4% |
| Period 8 of 2025-26 | 3,024 | 94.5% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Swansea | 38,654 | 69.0% | 2.8% |
| Aber | 37,329 | 93.0% | 4.4% |
| Llanbradach | 37,329 | 91.2% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out