Grand Central at Sunderland
All trains at SunderlandGrand Central across BritainNorth East
How this operator is doing here
Grand Central had 3,887 scheduled stops at Sunderland in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 66.3% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Grand Central trains at Sunderland also serve Seaham (7.8 km south, 67.3% on time, 1.9% cancelled), Hartlepool (26.9 km south-east, 61.3% on time, 2.2% cancelled), Eaglescliffe (41.9 km south, 57.9% on time, 2.0% cancelled), Darlington (44.2 km south, – on time, – cancelled), Northallerton (63.9 km south, 60.4% on time, 1.8% cancelled) and Thirsk (75.4 km south, 65.9% on time, 1.7% cancelled), which are the stations on its network closest to Sunderland.
The busiest Grand Central station within 30 km of Sunderland is Hartlepool, 26.9 km south-east, with about 11 scheduled stops a day.
Of the 2 operators with enough records at Sunderland, Grand Central is the least punctual, at 66.3%.
For Grand Central, Sunderland is the 4th best of 17 ranked stations. Its 66.3% here is 4.1 percentage points above the 62.2% across the whole network.
Grand Central at Sunderland has slipped sharply. 66.3% of stops came within three minutes of the timetable in the latest 13 periods, 6.9 percentage points worse than the 73.2% recorded in the 13 before. Cancellations held steady at 2.0% of scheduled stops, against 2.2% before.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 327 | 62.7% | 2.4% |
| Period 6 of 2026-27 | 316 | 63.3% | 2.5% |
| Period 5 of 2026-27 | 327 | 62.6% | 2.8% |
| Period 4 of 2026-27 | 252 | 57.9% | 0.0% |
| Period 3 of 2026-27 | 314 | 68.5% | 1.0% |
| Period 2 of 2026-27 | 269 | 64.0% | 4.1% |
| Period 1 of 2026-27 | 363 | 65.9% | 2.2% |
| Period 13 of 2025-26 | 310 | 73.1% | 0.3% |
| Period 12 of 2025-26 | 257 | 62.1% | 1.6% |
| Period 11 of 2025-26 | 315 | 73.4% | 1.0% |
| Period 10 of 2025-26 | 282 | 67.0% | 2.1% |
| Period 9 of 2025-26 | 293 | 70.3% | 3.4% |
| Period 8 of 2025-26 | 262 | 68.9% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sunderland
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,128 | 77.1% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out