Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Summerston

SUMScotlandManaged by ScotRail

On time, last 13 periods95.3%Great Britain: 83.6%
Cancelled1.3%Great Britain: 3.2%
Stops a day46Scheduled, on average
Punctuality rank118th of 2,374Among ranked stations

How this station is performing

Summerston has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 16,920 scheduled stops, about 46 a day. In those periods 95.3% of stops arrived within three minutes of the timetable and 1.3% of scheduled stops were cancelled.

Summerston opened on 1 October 1879 and closed to passengers on 2 April 1951. It reopened on 3 December 1993, 33 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Maryhill is the oldest (1858) and Kelvindale the newest (2005), with Summerston in between.

The nearest stations to Summerston are Maryhill (0.6 km west), Gilshochill (0.7 km east), Kelvindale (1.3 km south-west), Anniesland (2.1 km south-west) and Possilpark and Parkhouse (2.3 km south-east). 67 stations lie within 10 km in all. Of the five, Kelvindale is the most punctual at 95.6% and Anniesland the least at 88.1%, with Summerston on 95.3%.

Summerston is among the most punctual stations in Britain. Its 95.3% puts it 118th out of 2,374 ranked stations, with 117 ahead of it and 2,256 behind, and 11.4 percentage points above the national median of 83.9%.

1 of 3 stations of a similar size in Scotland are more punctual than Summerston on 95.3%. The comparison group includes Ashfield (94.2%), Gilshochill (95.3%) and Kelvindale (95.6%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 10 of 2024-25: 95.0%Period 11 of 2024-25: 96.7%Period 12 of 2024-25: 96.0%Period 13 of 2024-25: 95.7%Period 1 of 2025-26: 95.6%Period 2 of 2025-26: 96.8%Period 3 of 2025-26: 95.7%Period 4 of 2025-26: 96.5%Period 5 of 2025-26: 96.8%Period 6 of 2025-26: 95.2%Period 8 of 2025-26: 95.3%Period 9 of 2025-26: 92.3%Period 11 of 2025-26: 93.9%Period 12 of 2025-26: 96.1%Period 13 of 2025-26: 95.8%Period 1 of 2026-27: 95.5%Period 2 of 2026-27: 95.8%Period 3 of 2026-27: 96.0%Period 4 of 2026-27: 95.0%Period 5 of 2026-27: 94.3%Period 6 of 2026-27: 97.2%Period 7 of 2026-27: 95.6%
This pageGreat Britain
0%2%4%Period 1 of 2023-24: 2.7%Period 2 of 2023-24: 2.2%Period 3 of 2023-24: 1.5%Period 4 of 2023-24: 2.2%Period 5 of 2023-24: 2.8%Period 6 of 2023-24: 3.5%Period 7 of 2023-24: 3.2%Period 8 of 2023-24: 3.4%Period 9 of 2023-24: 2.7%Period 10 of 2023-24: 2.9%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 1.1%Period 13 of 2023-24: 1.2%Period 1 of 2024-25: 2.1%Period 2 of 2024-25: 1.5%Period 3 of 2024-25: 1.5%Period 4 of 2024-25: 2.3%Period 5 of 2024-25: 1.0%Period 6 of 2024-25: 0.9%Period 7 of 2024-25: 1.7%Period 8 of 2024-25: 1.0%Period 9 of 2024-25: 2.8%Period 10 of 2024-25: 1.0%Period 11 of 2024-25: 3.8%Period 12 of 2024-25: 0.9%Period 13 of 2024-25: 0.4%Period 1 of 2025-26: 1.5%Period 2 of 2025-26: 0.9%Period 3 of 2025-26: 1.7%Period 4 of 2025-26: 2.0%Period 5 of 2025-26: 2.7%Period 6 of 2025-26: 1.0%Period 7 of 2025-26: 3.2%Period 8 of 2025-26: 0.5%Period 9 of 2025-26: 1.8%Period 10 of 2025-26: 1.2%Period 11 of 2025-26: 0.9%Period 12 of 2025-26: 0.2%Period 13 of 2025-26: 1.1%Period 1 of 2026-27: 3.2%Period 2 of 2026-27: 1.3%Period 3 of 2026-27: 1.5%Period 4 of 2026-27: 1.8%Period 5 of 2026-27: 1.5%Period 6 of 2026-27: 0.4%Period 7 of 2026-27: 0.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail16,92095.3%1.3%

Operators with their own page for this station are linked to it.

Late train at Summerston? Delay Repay

These operators call at Summerston and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,30895.6%0.6%
Period 6 of 2026-271,30897.2%0.4%
Period 5 of 2026-271,30894.3%1.5%
Period 4 of 2026-271,30895.0%1.8%
Period 3 of 2026-271,30896.0%1.5%
Period 2 of 2026-271,29495.8%1.3%
Period 1 of 2026-271,46095.5%3.2%
Period 13 of 2025-261,40095.8%1.1%
Period 12 of 2025-261,28096.1%0.2%
Period 11 of 2025-261,28093.9%0.9%
Period 10 of 2025-261,106–1.2%
Period 9 of 2025-261,28092.3%1.8%
Period 8 of 2025-261,28095.3%0.5%

Time of year

80%90%100%P1: 95.5%1P2: 96.2%2P3: 95.9%3P4: 95.7%4P5: 95.4%5P6: 96.3%678910P11: 95.2%11P12: 96.0%12P13: 95.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Ashfield16,92094.2%1.2%
Gilshochill16,92095.3%1.3%
Kelvindale16,89895.6%1.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out