Kelvindale
KVDScotlandManaged by ScotRail
How this station is performing
Kelvindale had 16,898 scheduled stops to Period 7 of 2026-27, about 46 a day. 95.6% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Kelvindale opened on 26 September 2005, 21 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kelvindale is the newest; the oldest, Maryhill, opened in 1858.
The nearest stations to Kelvindale are Maryhill (0.8 km north-east), Anniesland (0.8 km south-west), Summerston (1.3 km north-east), Jordanhill (1.5 km south-west) and Hyndland (1.5 km south). 71 stations lie within 10 km in all. At 95.6%, Kelvindale is more punctual than every one of them; the best of the five, Summerston, manages 95.3%.
Kelvindale is among the most punctual stations in Britain. Its 95.6% puts it 104th out of 2,374 ranked stations, with 103 ahead of it and 2,270 behind, and 11.7 percentage points above the national median of 83.9%.
In Scotland, Kelvindale ranks 28th of 313 ranked stations. Its 95.6% is 7.9 percentage points better than the area median of 87.7%.
Compared with 3 stations of a similar size in Scotland, Kelvindale is the most punctual, at 95.6%. The comparison group includes Ashfield (94.2%), Gilshochill (95.3%) and Summerston (95.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 16,898 | 95.6% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Kelvindale? Delay Repay
These operators call at Kelvindale and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,304 | 96.5% | 0.6% |
| Period 6 of 2026-27 | 1,304 | 97.1% | 0.4% |
| Period 5 of 2026-27 | 1,304 | 95.6% | 1.4% |
| Period 4 of 2026-27 | 1,304 | 95.4% | 1.8% |
| Period 3 of 2026-27 | 1,304 | 96.1% | 1.5% |
| Period 2 of 2026-27 | 1,292 | 96.1% | 1.3% |
| Period 1 of 2026-27 | 1,460 | 95.4% | 3.2% |
| Period 13 of 2025-26 | 1,400 | 96.6% | 1.1% |
| Period 12 of 2025-26 | 1,280 | 96.3% | 0.2% |
| Period 11 of 2025-26 | 1,280 | 94.0% | 0.9% |
| Period 10 of 2025-26 | 1,106 | 95.4% | 1.3% |
| Period 9 of 2025-26 | 1,280 | 92.6% | 1.6% |
| Period 8 of 2025-26 | 1,280 | 95.7% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ashfield | 16,920 | 94.2% | 1.2% |
| Gilshochill | 16,920 | 95.3% | 1.3% |
| Summerston | 16,920 | 95.3% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out