Stow
SOIScotlandManaged by ScotRail
How this station is performing
Stow had 21,121 scheduled stops to Period 7 of 2026-27, about 58 a day. 91.2% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Stow opened on 1 August 1848 and closed to passengers on 6 January 1969. It reopened on 6 September 2015, 11 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Gorebridge is the oldest (1847) and Newtongrange the newest (2015), with Stow in between.
The nearest stations to Stow are Galashiels (9.1 km south-east), Tweedbank (11.7 km south-east), Gorebridge (19.9 km north-west), Newtongrange (23.0 km north-west) and Eskbank (25.0 km north-west). 1 stations lie within 10 km in all. Of the five, Tweedbank is the most punctual at 91.3% and Eskbank the least at 87.8%, with Stow on 91.2%.
Stow is one of 6 stations named after a Village called Stow, home to about 700 people; this one stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Stow was Period 5 of 2024-25, at 76.4%, some time before the latest year. The strongest was Period 8 of 2025-26, at 96.4%, and the two are 20.0 percentage points apart.
Compared with 3 stations of a similar size in Scotland, Stow is the most punctual, at 91.2%. The comparison group includes Eskbank (87.8%), Galashiels (89.1%) and Gorebridge (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,121 | 91.2% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Stow? Delay Repay
These operators call at Stow and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,600 | 90.3% | 1.1% |
| Period 6 of 2026-27 | 1,608 | 92.1% | 1.9% |
| Period 5 of 2026-27 | 1,615 | 81.5% | 1.6% |
| Period 4 of 2026-27 | 1,600 | 81.8% | 2.4% |
| Period 3 of 2026-27 | 1,600 | 87.5% | 1.3% |
| Period 2 of 2026-27 | 1,613 | 92.1% | 1.3% |
| Period 1 of 2026-27 | 1,878 | 93.2% | 1.0% |
| Period 13 of 2025-26 | 1,689 | 95.1% | 2.7% |
| Period 12 of 2025-26 | 1,632 | 95.8% | 0.7% |
| Period 11 of 2025-26 | 1,632 | 93.2% | 1.1% |
| Period 10 of 2025-26 | 1,390 | 91.2% | 1.5% |
| Period 9 of 2025-26 | 1,632 | 94.5% | 1.7% |
| Period 8 of 2025-26 | 1,632 | 96.4% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eskbank | 21,121 | 87.8% | 1.4% |
| Galashiels | 21,121 | 89.1% | 1.5% |
| Gorebridge | 21,121 | 89.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out