Eskbank
EKBScotlandManaged by ScotRail
How this station is performing
Eskbank had 21,121 scheduled stops to Period 7 of 2026-27, about 58 a day. 87.8% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Eskbank opened on 20 February 1849 and closed to passengers on 6 January 1969. It reopened on 6 September 2015, 11 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Gorebridge is the oldest (1847) and Shawfair the newest (2015), with Eskbank in between.
The nearest stations to Eskbank are Newtongrange (2.0 km south-east), Shawfair (4.1 km north), Gorebridge (5.1 km south-east), Newcraighall (5.8 km north) and Musselburgh (5.8 km north). 7 stations lie within 10 km in all. Of the five, Newtongrange is the most punctual at 90.9% and Musselburgh the least at 86.7%, with Eskbank on 87.8%.
Across the whole run of data, the weakest four-week period for Eskbank was Period 5 of 2024-25, at 67.4%, some time before the latest year. The strongest was Period 8 of 2025-26, at 93.2%, and the two are 25.8 percentage points apart.
Compared with 3 stations of a similar size in Scotland, Eskbank is the least punctual, at 87.8%. All of them are ahead, including Galashiels (89.1%), Gorebridge (89.8%) and Newtongrange (90.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,121 | 87.8% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Eskbank? Delay Repay
These operators call at Eskbank and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,600 | 86.0% | 1.1% |
| Period 6 of 2026-27 | 1,608 | 87.6% | 2.0% |
| Period 5 of 2026-27 | 1,615 | 79.5% | 1.7% |
| Period 4 of 2026-27 | 1,600 | 77.7% | 2.5% |
| Period 3 of 2026-27 | 1,600 | 86.2% | 1.2% |
| Period 2 of 2026-27 | 1,613 | 90.7% | 1.2% |
| Period 1 of 2026-27 | 1,878 | 90.2% | 1.0% |
| Period 13 of 2025-26 | 1,689 | 92.3% | 2.7% |
| Period 12 of 2025-26 | 1,632 | 93.0% | 0.7% |
| Period 11 of 2025-26 | 1,632 | 88.6% | 0.9% |
| Period 10 of 2025-26 | 1,390 | 84.3% | 1.5% |
| Period 9 of 2025-26 | 1,632 | 90.2% | 1.8% |
| Period 8 of 2025-26 | 1,632 | 93.2% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Galashiels | 21,121 | 89.1% | 1.5% |
| Gorebridge | 21,121 | 89.8% | 1.4% |
| Newtongrange | 21,121 | 90.9% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out