Stewarton
STTScotlandManaged by ScotRail
How this station is performing
Stewarton had 21,145 scheduled stops to Period 7 of 2026-27, about 58 a day. 93.3% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Stewarton opened on 27 March 1871, 155 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kilwinning is the oldest (1840) and Kilmaurs the newest (1873), with Stewarton in between.
The nearest stations to Stewarton are Dunlop (3.4 km north), Kilmaurs (5.1 km south), Kilmarnock (7.8 km south), Glengarnock (11.7 km north-west) and Kilwinning (12.4 km west). 3 stations lie within 10 km in all. Of the five, Dunlop is the most punctual at 93.7% and Kilwinning the least at 88.8%, with Stewarton on 93.3%.
Stewarton is one of 2 stations named after a town called Stewarton, home to about 7,420 people; this one stands 0.3 km from its centre.
For Stewarton, the weakest four-week period in the data is a recent one: Period 10 of 2025-26, when only 87.1% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2025-26, at 96.6%, which is 9.5 percentage points higher. Cancellations peaked at 5.5% of scheduled stops in Period 3 of 2026-27, against 2.3% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Stewarton on 93.3%. The comparison group includes Dunlop (93.7%), Kilmaurs (91.2%) and Eskbank (87.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,145 | 93.3% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Stewarton? Delay Repay
These operators call at Stewarton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,707 | 95.3% | 1.5% |
| Period 6 of 2026-27 | 774 | 94.7% | 1.6% |
| Period 5 of 2026-27 | 1,736 | 94.5% | 1.6% |
| Period 4 of 2026-27 | 1,722 | 92.4% | 2.5% |
| Period 3 of 2026-27 | 1,736 | 94.3% | 5.5% |
| Period 2 of 2026-27 | 1,636 | 94.5% | 1.5% |
| Period 1 of 2026-27 | 1,998 | 93.5% | 3.1% |
| Period 13 of 2025-26 | 1,450 | 94.7% | 1.7% |
| Period 12 of 2025-26 | 1,728 | 96.3% | 0.6% |
| Period 11 of 2025-26 | 1,725 | 92.9% | 1.9% |
| Period 10 of 2025-26 | 1,495 | 87.1% | 2.2% |
| Period 9 of 2025-26 | 1,710 | 90.8% | 3.0% |
| Period 8 of 2025-26 | 1,728 | 91.3% | 2.1% |
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out