Fairfield
FRFNorth WestManaged by Northern Trains
How this station is performing
Fairfield had 11,161 scheduled stops to Period 7 of 2026-27, about 31 a day. 89.1% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Fairfield opened on 17 November 1841. It was moved to the site it uses now on 2 May 1892. Of the 5 stations nearest to it with a known opening date, Fairfield is the oldest; the next oldest, Guide Bridge, dates from 1841.
The nearest stations to Fairfield are Gorton (1.5 km west), Denton (1.8 km south-east), Guide Bridge (2.1 km east), Ryder Brow (2.5 km south-west) and Reddish North (2.5 km south). 41 stations lie within 10 km in all. Of the five, Ryder Brow is the most punctual at 92.5% and Reddish North the least at 85.3%, with Fairfield on 89.1%.
Fairfield is one of 9 stations named after a suburb called Fairfield; this one stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Fairfield was Period 9 of 2023-24, at 73.2%, some time before the latest year. The strongest was Period 3 of 2025-26, at 95.1%, and the two are 21.9 percentage points apart. Cancellations peaked at 7.3% of scheduled stops in Period 8 of 2024-25, against 2.2% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Fairfield is the most punctual, at 89.1%. The comparison group includes Styal (77.1%), Moses Gate (52.6%) and Kearsley (Manchester) (54.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,161 | 89.1% | 2.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 884 | 89.9% | 1.6% |
| Period 6 of 2026-27 | 884 | 90.4% | 2.3% |
| Period 5 of 2026-27 | 790 | 87.8% | 2.5% |
| Period 4 of 2026-27 | 860 | 86.3% | 1.4% |
| Period 3 of 2026-27 | 794 | 93.4% | 0.6% |
| Period 2 of 2026-27 | 884 | 94.1% | 2.5% |
| Period 1 of 2026-27 | 1,026 | 89.1% | 3.5% |
| Period 13 of 2025-26 | 958 | 92.0% | 0.9% |
| Period 12 of 2025-26 | 627 | 92.1% | 2.9% |
| Period 11 of 2025-26 | 884 | 92.8% | 0.9% |
| Period 10 of 2025-26 | 808 | 89.8% | 4.3% |
| Period 9 of 2025-26 | 878 | 77.3% | 4.0% |
| Period 8 of 2025-26 | 884 | 83.8% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Styal | 11,278 | 77.1% | 2.3% |
| Moses Gate | 11,310 | 52.6% | 3.5% |
| Kearsley (Manchester) | 11,318 | 54.3% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out