Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Burscough Junction

BCJNorth WestManaged by Northern Trains

On time, last 13 periods89.4%Great Britain: 83.6%
Cancelled4.0%Great Britain: 3.2%
Stops a day29Scheduled, on average
Punctuality rank590th of 2,374Among ranked stations

How this station is performing

Burscough Junction has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,638 scheduled stops, about 29 a day. In those periods 89.4% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.

Burscough Junction opened on 2 April 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Burscough Junction is the oldest; the next oldest, Ormskirk, dates from 1849.

The nearest stations to Burscough Junction are Burscough Bridge (0.9 km north), New Lane (2.3 km north-west), Hoscar (2.4 km east), Ormskirk (4.1 km south-west) and Rufford (4.6 km north-east). 12 stations lie within 10 km in all. Of the five, Ormskirk is the most punctual at 94.1% and New Lane the least at 73.6%, with Burscough Junction on 89.4%.

Burscough Junction is named after Burscough, a Village, home to about 9,935 people, but the station stands 0.4 km from its centre.

1 of 3 stations of a similar size in North West are more punctual than Burscough Junction on 89.4%. The comparison group includes Croston (88.4%), Rufford (89.5%) and Burneside (Cumbria) (85.8%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.5%Period 2 of 2023-24: 94.6%Period 3 of 2023-24: 92.9%Period 4 of 2023-24: 95.5%Period 5 of 2023-24: 93.7%Period 6 of 2023-24: 93.7%Period 7 of 2023-24: 89.9%Period 8 of 2023-24: 85.5%Period 9 of 2023-24: 80.7%Period 10 of 2023-24: 91.0%Period 11 of 2023-24: 97.2%Period 12 of 2023-24: 94.5%Period 13 of 2023-24: 96.5%Period 1 of 2024-25: 94.5%Period 2 of 2024-25: 90.5%Period 3 of 2024-25: 95.9%Period 4 of 2024-25: 93.9%Period 5 of 2024-25: 91.6%Period 6 of 2024-25: 88.6%Period 7 of 2024-25: 88.5%Period 8 of 2024-25: 80.2%Period 9 of 2024-25: 83.3%Period 11 of 2024-25: 87.2%Period 12 of 2024-25: 94.3%Period 13 of 2024-25: 96.9%Period 1 of 2025-26: 94.6%Period 2 of 2025-26: 90.1%Period 3 of 2025-26: 93.7%Period 5 of 2025-26: 90.5%Period 6 of 2025-26: 94.3%Period 7 of 2025-26: 90.1%Period 8 of 2025-26: 80.9%Period 9 of 2025-26: 84.8%Period 10 of 2025-26: 91.9%Period 11 of 2025-26: 94.1%Period 12 of 2025-26: 93.9%Period 13 of 2025-26: 93.2%Period 2 of 2026-27: 91.3%Period 3 of 2026-27: 87.2%Period 4 of 2026-27: 90.1%Period 5 of 2026-27: 87.7%Period 6 of 2026-27: 92.6%Period 7 of 2026-27: 85.9%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.1%Period 2 of 2023-24: 3.8%Period 3 of 2023-24: 6.3%Period 4 of 2023-24: 5.6%Period 5 of 2023-24: 5.9%Period 6 of 2023-24: 6.2%Period 7 of 2023-24: 5.4%Period 8 of 2023-24: 5.1%Period 9 of 2023-24: 10.1%Period 10 of 2023-24: 9.9%Period 11 of 2023-24: 4.6%Period 12 of 2023-24: 3.4%Period 13 of 2023-24: 4.2%Period 1 of 2024-25: 3.3%Period 2 of 2024-25: 5.4%Period 3 of 2024-25: 5.3%Period 4 of 2024-25: 5.9%Period 5 of 2024-25: 6.0%Period 6 of 2024-25: 5.4%Period 7 of 2024-25: 4.9%Period 8 of 2024-25: 6.7%Period 9 of 2024-25: 7.9%Period 10 of 2024-25: 6.0%Period 11 of 2024-25: 5.9%Period 12 of 2024-25: 2.0%Period 13 of 2024-25: 1.9%Period 1 of 2025-26: 2.5%Period 2 of 2025-26: 4.5%Period 3 of 2025-26: 2.9%Period 4 of 2025-26: 3.7%Period 5 of 2025-26: 4.9%Period 6 of 2025-26: 2.7%Period 7 of 2025-26: 3.7%Period 8 of 2025-26: 3.9%Period 9 of 2025-26: 6.0%Period 10 of 2025-26: 5.0%Period 11 of 2025-26: 2.0%Period 12 of 2025-26: 2.2%Period 13 of 2025-26: 2.8%Period 1 of 2026-27: 4.1%Period 2 of 2026-27: 3.9%Period 3 of 2026-27: 5.1%Period 4 of 2026-27: 2.7%Period 5 of 2026-27: 6.6%Period 6 of 2026-27: 2.7%Period 7 of 2026-27: 5.1%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern10,63889.4%4.0%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2781685.9%5.1%
Period 6 of 2026-2781692.6%2.7%
Period 5 of 2026-2781687.7%6.6%
Period 4 of 2026-2781690.1%2.7%
Period 3 of 2026-2781687.2%5.1%
Period 2 of 2026-2781691.3%3.9%
Period 1 of 2026-27956–4.1%
Period 13 of 2025-2688493.2%2.8%
Period 12 of 2025-2681693.9%2.2%
Period 11 of 2025-2681694.1%2.0%
Period 10 of 2025-2663891.9%5.0%
Period 9 of 2025-2681684.8%6.0%
Period 8 of 2025-2681680.9%3.9%

Time of year

80%90%100%P1: 95.3%1P2: 91.7%2P3: 92.4%3P4: 93.1%4P5: 90.6%5P6: 92.3%6P7: 88.7%7P8: 82.1%8P9: 83.2%9P10: 91.5%10P11: 92.8%11P12: 94.3%12P13: 95.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Croston10,63888.4%4.0%
Rufford10,63889.5%4.0%
Burneside (Cumbria)10,93285.8%2.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out