Staplehurst
SPUSouth EastManaged by Southeastern
How this station is performing
Staplehurst had 28,086 scheduled stops to Period 7 of 2026-27, about 77 a day. 75.7% of recorded arrivals were within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
Staplehurst opened on 31 August 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Staplehurst is the oldest; the next oldest, Marden (Kent), dates from 1842.
The nearest stations to Staplehurst are Marden (Kent) (4.0 km west), Headcorn (5.4 km east), East Farleigh (10.3 km north-west), Beltring (10.9 km west) and Maidstone West (11.2 km north). 2 stations lie within 10 km in all. Of the five, East Farleigh is the most punctual at 95.0% and Marden (Kent) the least at 72.8%, with Staplehurst on 75.7%.
Staplehurst takes its name from a Village called Staplehurst, home to about 6,693 people, and the station stands 0.9 km from its centre.
For Staplehurst, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 57.3% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 87.9%, which is 30.6 percentage points higher.
Compared with 3 stations of a similar size in South East, Staplehurst is the least punctual, at 75.7%. All of them are ahead, including East Worthing (83.5%), Sunningdale (86.6%) and Herne Bay (77.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 28,086 | 75.7% | 1.1% |
Operators with their own page for this station are linked to it.
Late train at Staplehurst? Delay Repay
These operators call at Staplehurst and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,166 | 57.3% | 1.6% |
| Period 6 of 2026-27 | 2,103 | 60.4% | 1.1% |
| Period 5 of 2026-27 | 2,171 | 73.9% | 1.1% |
| Period 4 of 2026-27 | 2,131 | 80.1% | 1.2% |
| Period 3 of 2026-27 | 2,157 | 77.9% | 1.2% |
| Period 2 of 2026-27 | 2,131 | 81.7% | 0.9% |
| Period 1 of 2026-27 | 2,460 | 85.5% | 0.7% |
| Period 13 of 2025-26 | 2,318 | 82.6% | 0.8% |
| Period 12 of 2025-26 | 2,140 | 81.5% | 0.7% |
| Period 11 of 2025-26 | 2,093 | 79.9% | 0.9% |
| Period 10 of 2025-26 | 1,909 | 79.7% | 1.5% |
| Period 9 of 2025-26 | 2,155 | 69.6% | 1.9% |
| Period 8 of 2025-26 | 2,152 | 72.2% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Worthing | 28,083 | 83.5% | 3.7% |
| Sunningdale | 28,189 | 86.6% | 2.4% |
| Herne Bay | 27,968 | 77.0% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out