Sunningdale
SNGSouth EastManaged by South Western Railway
How this station is performing
Sunningdale had 28,189 scheduled stops to Period 7 of 2026-27, about 77 a day. 86.6% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Sunningdale opened on 4 June 1856, 170 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sunningdale is the oldest; the next oldest, Ascot (Berks), dates from 1856.
The nearest stations to Sunningdale are Longcross (2.8 km east), Ascot (Berks) (3.4 km north-west), Bagshot (4.9 km south-west), Virginia Water (5.0 km east) and Martins Heron (6.6 km west). 12 stations lie within 10 km in all. Of the five, Bagshot is the most punctual at 97.0% and Longcross the least at 86.1%, with Sunningdale on 86.6%.
Sunningdale takes its name from a Village called Sunningdale, home to about 5,638 people, and the station stands 0.8 km from its centre.
Sunningdale improved sharply over the past year. In the latest 13 periods 86.6% of stops came within three minutes of the timetable, up 6.7 percentage points from 79.9% in the 13 before. Cancellations held steady at 2.4% of scheduled stops, against 2.4% before.
Compared with 3 stations of a similar size in South East, Sunningdale is the most punctual, at 86.6%. The comparison group includes Headcorn (73.6%), Hersham (80.4%) and Staplehurst (75.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 28,189 | 86.6% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Sunningdale? Delay Repay
These operators call at Sunningdale and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,202 | 89.1% | 1.3% |
| Period 6 of 2026-27 | 2,043 | 88.1% | 2.2% |
| Period 5 of 2026-27 | 2,186 | 86.9% | 1.6% |
| Period 4 of 2026-27 | 2,048 | 88.3% | 3.0% |
| Period 3 of 2026-27 | 2,213 | 87.1% | 2.2% |
| Period 2 of 2026-27 | 2,184 | 88.8% | 4.8% |
| Period 1 of 2026-27 | 2,371 | 91.7% | 2.4% |
| Period 13 of 2025-26 | 2,418 | 88.9% | 1.6% |
| Period 12 of 2025-26 | 2,135 | 88.7% | 1.9% |
| Period 11 of 2025-26 | 2,117 | 87.1% | 1.5% |
| Period 10 of 2025-26 | 1,997 | 85.9% | 2.1% |
| Period 9 of 2025-26 | 2,069 | 75.9% | 2.2% |
| Period 8 of 2025-26 | 2,206 | 77.8% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Headcorn | 28,238 | 73.6% | 1.1% |
| Hersham | 28,289 | 80.4% | 3.2% |
| Staplehurst | 28,086 | 75.7% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out