Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

East Worthing

EWRSouth EastManaged by Govia Thameslink Railway (Southern)

On time, last 13 periods83.5%Great Britain: 83.6%
Cancelled3.7%Great Britain: 3.2%
Stops a day77Scheduled, on average
Punctuality rank1211th of 2,374Among ranked stations

How this station is performing

East Worthing had 28,083 scheduled stops to Period 7 of 2026-27, about 77 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.

East Worthing opened on 3 September 1905, 121 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Worthing is the oldest (1845) and Durrington-on-Sea the newest (1937), with East Worthing in between.

The nearest stations to East Worthing are Worthing (1.5 km west), Lancing (2.3 km east), West Worthing (2.7 km west), Durrington-on-Sea (4.0 km west) and Goring-by-Sea (5.5 km west). 9 stations lie within 10 km in all. At 83.5%, East Worthing is more punctual than every one of them; the best of the five, Lancing, manages 80.2%.

East Worthing takes its name from a suburb called East Worthing, and the station stands 1.0 km from its centre.

For East Worthing, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 76.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 92.0%, which is 15.2 percentage points higher.

1 of 3 stations of a similar size in South East are more punctual than East Worthing on 83.5%. The comparison group includes Staplehurst (75.7%), Sunningdale (86.6%) and Herne Bay (77.0%).

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 92.0%Period 2 of 2023-24: 89.3%Period 3 of 2023-24: 87.4%Period 4 of 2023-24: 85.8%Period 5 of 2023-24: 88.2%Period 6 of 2023-24: 90.4%Period 7 of 2023-24: 87.6%Period 8 of 2023-24: 79.2%Period 9 of 2023-24: 85.6%Period 10 of 2023-24: 87.4%Period 11 of 2023-24: 89.1%Period 12 of 2023-24: 87.9%Period 13 of 2023-24: 91.3%Period 1 of 2024-25: 85.7%Period 2 of 2024-25: 88.6%Period 3 of 2024-25: 86.7%Period 4 of 2024-25: 90.5%Period 5 of 2024-25: 88.4%Period 6 of 2024-25: 88.2%Period 7 of 2024-25: 86.9%Period 8 of 2024-25: 86.0%Period 9 of 2024-25: 81.2%Period 10 of 2024-25: 86.6%Period 11 of 2024-25: 87.4%Period 12 of 2024-25: 87.0%Period 13 of 2024-25: 88.6%Period 1 of 2025-26: 89.4%Period 2 of 2025-26: 89.5%Period 3 of 2025-26: 88.2%Period 4 of 2025-26: 84.3%Period 5 of 2025-26: 87.1%Period 6 of 2025-26: 86.9%Period 7 of 2025-26: 85.6%Period 8 of 2025-26: 83.5%Period 9 of 2025-26: 81.6%Period 10 of 2025-26: 85.5%Period 11 of 2025-26: 87.9%Period 12 of 2025-26: 87.4%Period 13 of 2025-26: 87.3%Period 1 of 2026-27: 87.0%Period 2 of 2026-27: 83.1%Period 3 of 2026-27: 81.0%Period 4 of 2026-27: 84.6%Period 5 of 2026-27: 79.8%Period 6 of 2026-27: 79.0%Period 7 of 2026-27: 76.8%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.5%Period 2 of 2023-24: 2.5%Period 3 of 2023-24: 4.0%Period 4 of 2023-24: 5.0%Period 5 of 2023-24: 1.8%Period 6 of 2023-24: 2.5%Period 7 of 2023-24: 2.9%Period 8 of 2023-24: 2.4%Period 9 of 2023-24: 3.0%Period 10 of 2023-24: 3.7%Period 11 of 2023-24: 2.1%Period 12 of 2023-24: 3.8%Period 13 of 2023-24: 2.6%Period 1 of 2024-25: 2.0%Period 2 of 2024-25: 1.6%Period 3 of 2024-25: 2.6%Period 4 of 2024-25: 1.8%Period 5 of 2024-25: 2.5%Period 6 of 2024-25: 2.6%Period 7 of 2024-25: 2.4%Period 8 of 2024-25: 3.7%Period 9 of 2024-25: 3.3%Period 10 of 2024-25: 2.8%Period 11 of 2024-25: 2.8%Period 12 of 2024-25: 3.1%Period 13 of 2024-25: 2.8%Period 1 of 2025-26: 2.8%Period 2 of 2025-26: 2.3%Period 3 of 2025-26: 2.3%Period 4 of 2025-26: 3.5%Period 5 of 2025-26: 2.9%Period 6 of 2025-26: 2.9%Period 7 of 2025-26: 3.8%Period 8 of 2025-26: 2.4%Period 9 of 2025-26: 4.1%Period 10 of 2025-26: 2.3%Period 11 of 2025-26: 3.3%Period 12 of 2025-26: 3.1%Period 13 of 2025-26: 4.7%Period 1 of 2026-27: 3.4%Period 2 of 2026-27: 6.1%Period 3 of 2026-27: 3.9%Period 4 of 2026-27: 3.0%Period 5 of 2026-27: 3.4%Period 6 of 2026-27: 3.8%Period 7 of 2026-27: 4.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR28,08383.5%3.7%

Operators with their own page for this station are linked to it.

Late train at East Worthing? Delay Repay

These operators call at East Worthing and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,16276.8%4.0%
Period 6 of 2026-272,15479.0%3.8%
Period 5 of 2026-272,17379.8%3.4%
Period 4 of 2026-272,17084.6%3.0%
Period 3 of 2026-272,17081.0%3.9%
Period 2 of 2026-272,10883.1%6.1%
Period 1 of 2026-272,39787.0%3.4%
Period 13 of 2025-262,32187.3%4.7%
Period 12 of 2025-262,19687.4%3.1%
Period 11 of 2025-262,17287.9%3.3%
Period 10 of 2025-261,87885.5%2.3%
Period 9 of 2025-262,08581.6%4.1%
Period 8 of 2025-262,09783.5%2.4%

Time of year

75%80%85%90%P1: 88.5%1P2: 87.6%2P3: 85.8%3P4: 86.3%4P5: 85.8%5P6: 86.1%6P7: 84.2%7P8: 82.9%8P9: 82.7%9P10: 86.5%10P11: 88.1%11P12: 87.4%12P13: 89.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Staplehurst28,08675.7%1.1%
Sunningdale28,18986.6%2.4%
Herne Bay27,96877.0%2.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out