East Worthing
EWRSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
East Worthing had 28,083 scheduled stops to Period 7 of 2026-27, about 77 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
East Worthing opened on 3 September 1905, 121 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Worthing is the oldest (1845) and Durrington-on-Sea the newest (1937), with East Worthing in between.
The nearest stations to East Worthing are Worthing (1.5 km west), Lancing (2.3 km east), West Worthing (2.7 km west), Durrington-on-Sea (4.0 km west) and Goring-by-Sea (5.5 km west). 9 stations lie within 10 km in all. At 83.5%, East Worthing is more punctual than every one of them; the best of the five, Lancing, manages 80.2%.
East Worthing takes its name from a suburb called East Worthing, and the station stands 1.0 km from its centre.
For East Worthing, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 76.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 92.0%, which is 15.2 percentage points higher.
1 of 3 stations of a similar size in South East are more punctual than East Worthing on 83.5%. The comparison group includes Staplehurst (75.7%), Sunningdale (86.6%) and Herne Bay (77.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 28,083 | 83.5% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at East Worthing? Delay Repay
These operators call at East Worthing and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,162 | 76.8% | 4.0% |
| Period 6 of 2026-27 | 2,154 | 79.0% | 3.8% |
| Period 5 of 2026-27 | 2,173 | 79.8% | 3.4% |
| Period 4 of 2026-27 | 2,170 | 84.6% | 3.0% |
| Period 3 of 2026-27 | 2,170 | 81.0% | 3.9% |
| Period 2 of 2026-27 | 2,108 | 83.1% | 6.1% |
| Period 1 of 2026-27 | 2,397 | 87.0% | 3.4% |
| Period 13 of 2025-26 | 2,321 | 87.3% | 4.7% |
| Period 12 of 2025-26 | 2,196 | 87.4% | 3.1% |
| Period 11 of 2025-26 | 2,172 | 87.9% | 3.3% |
| Period 10 of 2025-26 | 1,878 | 85.5% | 2.3% |
| Period 9 of 2025-26 | 2,085 | 81.6% | 4.1% |
| Period 8 of 2025-26 | 2,097 | 83.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Staplehurst | 28,086 | 75.7% | 1.1% |
| Sunningdale | 28,189 | 86.6% | 2.4% |
| Herne Bay | 27,968 | 77.0% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out