Stalybridge
SYBNorth WestManaged by TransPennine Express
How this station is performing
Stalybridge had 40,817 scheduled stops to Period 7 of 2026-27, about 112 a day. 72.3% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Stalybridge opened on 23 December 1845, 181 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Newton For Hyde is the oldest (1841) and Flowery Field the newest (1985), with Stalybridge in between.
The nearest stations to Stalybridge are Ashton-under-Lyne (2.1 km west), Hyde North (2.6 km south-west), Flowery Field (2.7 km south-west), Newton For Hyde (3.1 km south) and Guide Bridge (3.4 km west). 31 stations lie within 10 km in all. At 72.3%, Stalybridge is less punctual than all of them; the best of the five, Hyde North, manages 91.6%.
Stalybridge takes its name from a town called Stalybridge, home to about 26,830 people, and the station stands 1.6 km from its centre.
2 operators call at Stalybridge: TransPennine Express (69.7%, 71% of stops) and Northern (78.8%, 29% of stops). The operator you travel with matters: Northern reaches 78.8% within three minutes while TransPennine Express manages 69.7%, a gap of 9.1 percentage points.
Compared with 3 stations of a similar size in North West, Stalybridge is the least punctual, at 72.3%. All of them are ahead, including Bache (87.6%), Ashburys (90.3%) and West Kirby (93.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 29,170 | 69.7% | 2.6% |
| Northern | 11,647 | 78.8% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Stalybridge? Delay Repay
These operators call at Stalybridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,726 | 76.1% | 1.4% |
| Period 6 of 2026-27 | 3,239 | 74.0% | 2.4% |
| Period 5 of 2026-27 | 2,878 | 71.3% | 5.5% |
| Period 4 of 2026-27 | 2,709 | 68.3% | 2.7% |
| Period 3 of 2026-27 | 3,173 | 74.7% | 2.9% |
| Period 2 of 2026-27 | 2,840 | 82.5% | 2.2% |
| Period 1 of 2026-27 | 3,621 | 76.2% | 1.6% |
| Period 13 of 2025-26 | 3,562 | 76.7% | 1.2% |
| Period 12 of 2025-26 | 3,124 | 75.0% | 1.3% |
| Period 11 of 2025-26 | 3,133 | 75.3% | 6.4% |
| Period 10 of 2025-26 | 3,015 | 70.1% | 3.9% |
| Period 9 of 2025-26 | 3,313 | 56.2% | 3.5% |
| Period 8 of 2025-26 | 3,484 | 64.2% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bache | 40,811 | 87.6% | 2.9% |
| Ashburys | 40,984 | 90.3% | 2.0% |
| West Kirby | 40,584 | 93.2% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out