Northern at Stalybridge
How this operator is doing here
Northern had 11,647 scheduled stops at Stalybridge in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 78.8% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
Northern trains at Stalybridge also serve Ashton-under-Lyne (2.1 km west, 81.6% on time, 3.4% cancelled), Hyde North (2.6 km south-west, 91.6% on time, 2.1% cancelled), Flowery Field (2.7 km south-west, 87.8% on time, 2.1% cancelled), Newton For Hyde (3.1 km south, 87.4% on time, 2.1% cancelled), Guide Bridge (3.4 km west, 87.6% on time, 2.1% cancelled) and Godley (3.6 km south, 87.3% on time, 2.1% cancelled), which are the stations on its network closest to Stalybridge.
Within 30 km of here, Northern runs best at Rose Hill Marple, 9.8 km south (93.3%), and worst at Moses Gate, 23.7 km west (52.6%).
The busiest Northern station within 30 km of Stalybridge is Manchester Piccadilly, 11.0 km west, with about 508 scheduled stops a day.
Northern at Stalybridge has slipped a little, from 82.2% within three minutes in the previous 13 periods to 78.8% in the latest 13, a fall of 3.4 percentage points. Cancellations fell to 3.5% of scheduled stops from 5.6%, which is 2.1 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 916 | 78.0% | 1.4% |
| Period 6 of 2026-27 | 920 | 80.4% | 2.3% |
| Period 5 of 2026-27 | 726 | 83.3% | 6.9% |
| Period 4 of 2026-27 | 730 | 78.7% | 4.1% |
| Period 3 of 2026-27 | 920 | 80.7% | 3.9% |
| Period 2 of 2026-27 | 916 | 78.1% | 2.3% |
| Period 1 of 2026-27 | 1,070 | 79.1% | 1.3% |
| Period 13 of 2025-26 | 956 | 82.0% | 2.3% |
| Period 12 of 2025-26 | 912 | 81.1% | 1.8% |
| Period 11 of 2025-26 | 916 | 79.4% | 2.4% |
| Period 10 of 2025-26 | 834 | 78.1% | 9.7% |
| Period 9 of 2025-26 | 916 | 70.3% | 5.1% |
| Period 8 of 2025-26 | 915 | 76.1% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stalybridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 29,170 | 69.7% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out