TransPennine Express at Stalybridge
All trains at StalybridgeTransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 29,170 scheduled stops at Stalybridge in the 13 periods to Period 7 of 2026-27, 71% of the station's total. 69.7% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
TransPennine Express trains at Stalybridge also serve Guide Bridge (3.4 km west, – on time, – cancelled), Mossley (Manchester) (3.7 km north-east, 63.6% on time, 2.9% cancelled), Greenfield (6.9 km north-east, 65.9% on time, 2.9% cancelled), Stockport (10.9 km south-west, 61.2% on time, 2.8% cancelled), Manchester Piccadilly (11.0 km west, 65.8% on time, 3.5% cancelled) and Manchester Victoria (11.8 km west, 69.2% on time, 2.8% cancelled), which are the stations on its network closest to Stalybridge.
Within 30 km of here, TransPennine Express runs best at Manchester Airport, 19.1 km south-west (77.8%), and worst at Manchester Oxford Road, 11.9 km west (53.6%).
The busiest TransPennine Express station within 30 km of Stalybridge is Manchester Piccadilly, 11.0 km west, with about 152 scheduled stops a day.
Of the 2 operators with enough records at Stalybridge, TransPennine Express is the least punctual, at 69.7%.
Over three full railway years TransPennine Express at Stalybridge has improved each time, from 62.0% within three minutes in 2023-24 to 66.1% in 2024-25 and 68.7% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,810 | 75.1% | 1.3% |
| Period 6 of 2026-27 | 2,319 | 71.5% | 2.4% |
| Period 5 of 2026-27 | 2,152 | 67.3% | 5.0% |
| Period 4 of 2026-27 | 1,979 | 64.6% | 2.1% |
| Period 3 of 2026-27 | 2,253 | 72.2% | 2.5% |
| Period 2 of 2026-27 | 1,924 | 84.6% | 2.2% |
| Period 1 of 2026-27 | 2,551 | 75.0% | 1.7% |
| Period 13 of 2025-26 | 2,606 | 74.8% | 0.8% |
| Period 12 of 2025-26 | 2,212 | 72.5% | 1.1% |
| Period 11 of 2025-26 | 2,217 | 73.5% | 8.0% |
| Period 10 of 2025-26 | 2,181 | 67.3% | 1.7% |
| Period 9 of 2025-26 | 2,397 | 50.9% | 2.9% |
| Period 8 of 2025-26 | 2,569 | 60.0% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stalybridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,647 | 78.8% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out