Southeastern at St Mary Cray
How this operator is doing here
Southeastern had 33,782 scheduled stops at St Mary Cray in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 81.7% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Southeastern trains at St Mary Cray also serve Petts Wood (2.3 km west, 84.2% on time, 1.5% cancelled), Orpington (2.6 km south-west, 80.1% on time, 1.7% cancelled), Chislehurst (3.6 km west, 91.0% on time, 1.2% cancelled), Chelsfield (4.2 km south, 80.2% on time, 1.4% cancelled), Swanley (4.3 km east, 82.4% on time, 1.3% cancelled) and Bickley (4.3 km west, 84.6% on time, 2.0% cancelled), which are the stations on its network closest to St Mary Cray.
Within 30 km of here, Southeastern runs best at Sundridge Park, 6.2 km west (99.4%), and worst at Hildenborough, 21.8 km south-east (70.3%).
The busiest Southeastern station within 30 km of St Mary Cray is London Bridge, 18.0 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at St Mary Cray, Southeastern is the least punctual, at 81.7%.
For Southeastern, St Mary Cray is the 99th best of 173 ranked stations. Its 81.7% here is 2.5 percentage points below the 84.2% across the whole network.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,655 | 77.1% | 1.3% |
| Period 6 of 2026-27 | 2,613 | 76.1% | 1.8% |
| Period 5 of 2026-27 | 2,716 | 79.7% | 2.0% |
| Period 4 of 2026-27 | 2,689 | 84.4% | 1.3% |
| Period 3 of 2026-27 | 2,636 | 80.7% | 1.7% |
| Period 2 of 2026-27 | 2,606 | 83.1% | 1.3% |
| Period 1 of 2026-27 | 2,871 | 90.2% | 0.6% |
| Period 13 of 2025-26 | 2,734 | 88.0% | 0.8% |
| Period 12 of 2025-26 | 2,538 | 86.8% | 1.1% |
| Period 11 of 2025-26 | 2,566 | 84.1% | 1.4% |
| Period 10 of 2025-26 | 2,202 | 83.8% | 1.2% |
| Period 9 of 2025-26 | 2,464 | 73.1% | 1.4% |
| Period 8 of 2025-26 | 2,492 | 73.7% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at St Mary Cray
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,723 | 91.1% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out