Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

St Mary Cray

SMYLondonManaged by Southeastern

On time, last 13 periods85.7%Great Britain: 83.6%
Cancelled2.0%Great Britain: 3.2%
Stops a day164Scheduled, on average
Punctuality rank1005th of 2,374Among ranked stations

How this station is performing

St Mary Cray had 59,505 scheduled stops to Period 7 of 2026-27, about 164 a day. 85.7% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.

St Mary Cray opened on 3 December 1860, 166 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, St Mary Cray is the oldest; the next oldest, Swanley, dates from 1862.

The nearest stations to St Mary Cray are Petts Wood (2.3 km west), Orpington (2.6 km south-west), Chislehurst (3.6 km west), Chelsfield (4.2 km south) and Swanley (4.3 km east). 38 stations lie within 10 km in all. Of the five, Chislehurst is the most punctual at 91.0% and Orpington the least at 80.2%, with St Mary Cray on 85.7%.

St Mary Cray takes its name from an area of London called St Mary Cray, and the station stands 0.3 km from its centre.

2 operators call at St Mary Cray: Southeastern (81.7%, 57% of stops) and GTR (91.1%, 43% of stops). The operator you travel with matters: GTR reaches 91.1% within three minutes while Southeastern manages 81.7%, a gap of 9.4 percentage points.

Compared with 3 stations of a similar size in London, St Mary Cray is the least punctual, at 85.7%. All of them are ahead, including Sidcup (86.8%), Bexley (87.1%) and Crayford (88.4%).

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 93.5%Period 2 of 2023-24: 91.6%Period 3 of 2023-24: 89.4%Period 4 of 2023-24: 92.0%Period 5 of 2023-24: 91.8%Period 6 of 2023-24: 91.1%Period 7 of 2023-24: 91.1%Period 8 of 2023-24: 85.7%Period 9 of 2023-24: 84.3%Period 10 of 2023-24: 84.5%Period 11 of 2023-24: 86.8%Period 12 of 2023-24: 89.6%Period 13 of 2023-24: 92.4%Period 1 of 2024-25: 90.4%Period 2 of 2024-25: 90.6%Period 3 of 2024-25: 90.6%Period 4 of 2024-25: 88.0%Period 5 of 2024-25: 89.4%Period 6 of 2024-25: 89.7%Period 7 of 2024-25: 85.6%Period 8 of 2024-25: 83.8%Period 9 of 2024-25: 77.4%Period 10 of 2024-25: 84.6%Period 11 of 2024-25: 86.1%Period 12 of 2024-25: 89.5%Period 13 of 2024-25: 88.4%Period 1 of 2025-26: 89.7%Period 2 of 2025-26: 86.6%Period 3 of 2025-26: 89.8%Period 4 of 2025-26: 88.3%Period 5 of 2025-26: 89.7%Period 6 of 2025-26: 89.7%Period 7 of 2025-26: 87.8%Period 8 of 2025-26: 81.5%Period 9 of 2025-26: 79.9%Period 10 of 2025-26: 87.8%Period 11 of 2025-26: 88.2%Period 12 of 2025-26: 89.8%Period 13 of 2025-26: 90.6%Period 1 of 2026-27: 92.5%Period 2 of 2026-27: 86.9%Period 3 of 2026-27: 85.0%Period 4 of 2026-27: 87.1%Period 5 of 2026-27: 84.0%Period 6 of 2026-27: 79.2%Period 7 of 2026-27: 80.7%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 2.1%Period 2 of 2023-24: 1.3%Period 3 of 2023-24: 1.7%Period 4 of 2023-24: 2.0%Period 5 of 2023-24: 1.2%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 1.9%Period 8 of 2023-24: 1.9%Period 9 of 2023-24: 2.9%Period 10 of 2023-24: 3.8%Period 11 of 2023-24: 1.9%Period 12 of 2023-24: 1.6%Period 13 of 2023-24: 1.5%Period 1 of 2024-25: 1.7%Period 2 of 2024-25: 1.7%Period 3 of 2024-25: 2.2%Period 4 of 2024-25: 2.5%Period 5 of 2024-25: 1.5%Period 6 of 2024-25: 1.2%Period 7 of 2024-25: 3.1%Period 8 of 2024-25: 3.1%Period 9 of 2024-25: 3.8%Period 10 of 2024-25: 4.9%Period 11 of 2024-25: 0.9%Period 12 of 2024-25: 2.6%Period 13 of 2024-25: 1.6%Period 1 of 2025-26: 1.6%Period 2 of 2025-26: 1.5%Period 3 of 2025-26: 2.7%Period 4 of 2025-26: 2.3%Period 5 of 2025-26: 2.9%Period 6 of 2025-26: 3.5%Period 7 of 2025-26: 2.3%Period 8 of 2025-26: 2.3%Period 9 of 2025-26: 2.7%Period 10 of 2025-26: 2.3%Period 11 of 2025-26: 1.7%Period 12 of 2025-26: 1.5%Period 13 of 2025-26: 1.7%Period 1 of 2026-27: 0.8%Period 2 of 2026-27: 2.2%Period 3 of 2026-27: 2.5%Period 4 of 2026-27: 2.3%Period 5 of 2026-27: 2.6%Period 6 of 2026-27: 2.7%Period 7 of 2026-27: 1.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Southeastern33,78281.7%1.3%
GTR25,72391.1%3.0%

Operators with their own page for this station are linked to it.

Late train at St Mary Cray? Delay Repay

These operators call at St Mary Cray and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-274,64280.7%1.5%
Period 6 of 2026-274,50179.2%2.7%
Period 5 of 2026-274,77584.0%2.6%
Period 4 of 2026-274,74487.1%2.3%
Period 3 of 2026-274,49485.0%2.5%
Period 2 of 2026-274,45186.9%2.2%
Period 1 of 2026-275,01392.5%0.8%
Period 13 of 2025-264,90790.6%1.7%
Period 12 of 2025-264,53289.8%1.5%
Period 11 of 2025-264,58688.2%1.7%
Period 10 of 2025-263,99187.8%2.3%
Period 9 of 2025-264,39279.9%2.7%
Period 8 of 2025-264,47781.5%2.3%

Time of year

75%80%85%90%95%P1: 91.6%1P2: 88.9%2P3: 88.6%3P4: 88.8%4P5: 88.6%5P6: 87.3%6P7: 86.1%7P8: 83.7%8P9: 80.5%9P10: 85.6%10P11: 87.0%11P12: 89.6%12P13: 90.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Sidcup59,56686.8%1.4%
Bexley59,27887.1%1.4%
Crayford59,94088.4%1.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out