Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at St Mary Cray

All trains at St Mary CrayGTR across BritainLondon

On time, last 13 periods91.1%Whole station: 85.7%
Cancelled3.0%Whole station: 2.0%
Scheduled stops25,723Of 59,505 at the station

How this operator is doing here

GTR had 25,723 scheduled stops at St Mary Cray in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 91.1% of recorded arrivals came within three minutes and 3.0% of stops were cancelled.

GTR trains at St Mary Cray also serve Petts Wood (2.3 km west, 84.3% on time, 5.8% cancelled), Orpington (2.6 km south-west, 81.0% on time, 5.9% cancelled), Swanley (4.3 km east, 88.0% on time, 3.0% cancelled), Bickley (4.3 km west, 87.4% on time, 3.4% cancelled), Bromley South (6.1 km west, 87.8% on time, 3.2% cancelled) and Shortlands (7.3 km west, 89.8% on time, 3.6% cancelled), which are the stations on its network closest to St Mary Cray.

Within 30 km of here, GTR runs best at Beckenham Junction, 9.3 km west (98.1%), and worst at Kenley, 16.4 km south-west (66.9%).

The busiest GTR station within 30 km of St Mary Cray is East Croydon, 14.0 km west, with about 813 scheduled stops a day.

Of the 2 operators with enough records at St Mary Cray, GTR is the most punctual, at 91.1%.

For GTR, St Mary Cray is the 45th best of 307 ranked stations. Its 91.1% here is 8.2 percentage points above the 82.9% across the whole network.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 94.8%Period 2 of 2023-24: 94.4%Period 3 of 2023-24: 92.2%Period 4 of 2023-24: 94.3%Period 5 of 2023-24: 93.9%Period 6 of 2023-24: 93.3%Period 7 of 2023-24: 95.0%Period 8 of 2023-24: 89.9%Period 9 of 2023-24: 90.8%Period 10 of 2023-24: 88.8%Period 11 of 2023-24: 90.0%Period 12 of 2023-24: 94.1%Period 13 of 2023-24: 93.8%Period 1 of 2024-25: 91.8%Period 2 of 2024-25: 93.4%Period 3 of 2024-25: 93.5%Period 4 of 2024-25: 91.7%Period 5 of 2024-25: 92.7%Period 6 of 2024-25: 92.5%Period 7 of 2024-25: 89.4%Period 8 of 2024-25: 90.5%Period 9 of 2024-25: 86.0%Period 10 of 2024-25: 91.2%Period 11 of 2024-25: 91.1%Period 12 of 2024-25: 92.8%Period 13 of 2024-25: 93.0%Period 1 of 2025-26: 94.4%Period 2 of 2025-26: 93.1%Period 3 of 2025-26: 92.5%Period 4 of 2025-26: 92.5%Period 5 of 2025-26: 93.5%Period 6 of 2025-26: 93.0%Period 7 of 2025-26: 93.0%Period 8 of 2025-26: 91.6%Period 9 of 2025-26: 88.9%Period 10 of 2025-26: 92.7%Period 11 of 2025-26: 93.4%Period 12 of 2025-26: 93.7%Period 13 of 2025-26: 93.9%Period 1 of 2026-27: 95.6%Period 2 of 2026-27: 92.3%Period 3 of 2026-27: 91.2%Period 4 of 2026-27: 90.7%Period 5 of 2026-27: 89.6%Period 6 of 2026-27: 83.8%Period 7 of 2026-27: 85.6%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 3.6%Period 2 of 2023-24: 2.5%Period 3 of 2023-24: 2.4%Period 4 of 2023-24: 2.6%Period 5 of 2023-24: 1.9%Period 6 of 2023-24: 2.4%Period 7 of 2023-24: 2.1%Period 8 of 2023-24: 2.2%Period 9 of 2023-24: 5.1%Period 10 of 2023-24: 4.5%Period 11 of 2023-24: 2.8%Period 12 of 2023-24: 1.5%Period 13 of 2023-24: 1.9%Period 1 of 2024-25: 2.8%Period 2 of 2024-25: 3.1%Period 3 of 2024-25: 3.0%Period 4 of 2024-25: 4.1%Period 5 of 2024-25: 2.5%Period 6 of 2024-25: 1.5%Period 7 of 2024-25: 5.1%Period 8 of 2024-25: 4.6%Period 9 of 2024-25: 5.8%Period 10 of 2024-25: 6.8%Period 11 of 2024-25: 0.9%Period 12 of 2024-25: 4.3%Period 13 of 2024-25: 2.4%Period 1 of 2025-26: 2.7%Period 2 of 2025-26: 2.0%Period 3 of 2025-26: 3.9%Period 4 of 2025-26: 2.5%Period 5 of 2025-26: 4.4%Period 6 of 2025-26: 5.5%Period 7 of 2025-26: 3.5%Period 8 of 2025-26: 3.7%Period 9 of 2025-26: 4.4%Period 10 of 2025-26: 3.6%Period 11 of 2025-26: 2.0%Period 12 of 2025-26: 1.9%Period 13 of 2025-26: 2.9%Period 1 of 2026-27: 1.0%Period 2 of 2026-27: 3.5%Period 3 of 2026-27: 3.8%Period 4 of 2026-27: 3.6%Period 5 of 2026-27: 3.4%Period 6 of 2026-27: 4.0%Period 7 of 2026-27: 1.7%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,98785.6%1.7%
Period 6 of 2026-271,88883.8%4.0%
Period 5 of 2026-272,05989.6%3.4%
Period 4 of 2026-272,05590.7%3.6%
Period 3 of 2026-271,85891.2%3.8%
Period 2 of 2026-271,84592.3%3.5%
Period 1 of 2026-272,14295.6%1.0%
Period 13 of 2025-262,17393.9%2.9%
Period 12 of 2025-261,99493.7%1.9%
Period 11 of 2025-262,02093.4%2.0%
Period 10 of 2025-261,78992.7%3.6%
Period 9 of 2025-261,92888.9%4.4%
Period 8 of 2025-261,98591.6%3.7%

Time of year

80%90%100%P1: 94.2%1P2: 93.3%2P3: 92.4%3P4: 92.3%4P5: 92.4%5P6: 90.7%6P7: 90.7%7P8: 90.7%8P9: 88.5%9P10: 90.9%10P11: 91.5%11P12: 93.5%12P13: 93.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at St Mary Cray

OperatorScheduled stopsWithin 3 minCancelled
Southeastern33,78281.7%1.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out