CrossCountry at St Erth
How this operator is doing here
CrossCountry had 1,445 scheduled stops at St Erth in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 54.1% of recorded arrivals came within three minutes and 14.4% of stops were cancelled.
CrossCountry trains at St Erth also serve Hayle (2.4 km north-east, 56.5% on time, 12.9% cancelled), Penzance (8.2 km south-west, 63.5% on time, 14.8% cancelled), Camborne (11.3 km north-east, 56.6% on time, 12.9% cancelled), Redruth (17.0 km north-east, 58.9% on time, 14.1% cancelled), Truro (28.9 km east, 56.4% on time, 12.9% cancelled) and St Austell (50.2 km east, 59.5% on time, 12.2% cancelled), which are the stations on its network closest to St Erth.
The busiest CrossCountry station within 30 km of St Erth is Penzance, 8.2 km south-west, with about 4 scheduled stops a day.
Of the 2 operators with enough records at St Erth, CrossCountry is the least punctual, at 54.1%.
CrossCountry at St Erth has slipped sharply. 54.1% of stops came within three minutes of the timetable in the latest 13 periods, 14.4 percentage points worse than the 68.5% recorded in the 13 before. Cancellations rose to 14.4% of scheduled stops from 12.4%, which is 2.0 percentage points more.
Over three full railway years CrossCountry at St Erth has got worse each time, from 77.2% within three minutes in 2023-24 to 73.9% in 2024-25 and 62.8% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 62.6% | 17.5% |
| Period 6 of 2026-27 | 120 | 50.0% | 15.0% |
| Period 5 of 2026-27 | 117 | 43.3% | 16.2% |
| Period 4 of 2026-27 | 120 | 47.9% | 20.0% |
| Period 3 of 2026-27 | 108 | 54.5% | 8.3% |
| Period 2 of 2026-27 | 112 | 51.5% | 13.4% |
| Period 1 of 2026-27 | 120 | 57.9% | 5.0% |
| Period 13 of 2025-26 | 114 | 65.1% | 7.0% |
| Period 12 of 2025-26 | 104 | 49.0% | 3.8% |
| Period 11 of 2025-26 | 104 | 57.0% | 24.0% |
| Period 10 of 2025-26 | 96 | 53.8% | 32.3% |
| Period 9 of 2025-26 | 94 | 45.5% | 18.1% |
| Period 8 of 2025-26 | 116 | 61.9% | 9.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at St Erth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 37,844 | 80.6% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out