Northern at Sowerby Bridge
All trains at Sowerby BridgeNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 27,237 scheduled stops at Sowerby Bridge in the 13 periods to Period 7 of 2026-27, 93% of the station's total. 58.5% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Northern trains at Sowerby Bridge also serve Halifax (3.8 km east, 72.0% on time, 3.7% cancelled), Mytholmroyd (5.4 km north-west, 59.3% on time, 2.6% cancelled), Hebden Bridge (7.5 km north-west, 60.2% on time, 2.5% cancelled), Brighouse (8.5 km east, 83.5% on time, 2.2% cancelled), Huddersfield (10.4 km south-east, 82.0% on time, 1.5% cancelled) and Lockwood (10.7 km south-east, 85.6% on time, 1.6% cancelled), which are the stations on its network closest to Sowerby Bridge.
Within 30 km of here, Northern runs best at Bradford Forster Square, 14.2 km north-east (93.3%), and worst at Mytholmroyd, 5.4 km north-west (59.3%).
The busiest Northern station within 30 km of Sowerby Bridge is Leeds, 25.5 km east, with about 780 scheduled stops a day.
Of the 2 operators with enough records at Sowerby Bridge, Northern is the least punctual, at 58.5%.
Over three full railway years Northern at Sowerby Bridge has got worse each time, from 61.8% within three minutes in 2023-24 to 60.0% in 2024-25 and 56.9% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,815 | 54.3% | 1.2% |
| Period 6 of 2026-27 | 2,170 | 64.0% | 2.0% |
| Period 5 of 2026-27 | 2,171 | 64.6% | 2.5% |
| Period 4 of 2026-27 | 2,045 | 64.5% | 2.2% |
| Period 3 of 2026-27 | 2,012 | 57.2% | 1.7% |
| Period 2 of 2026-27 | 1,607 | 49.8% | 3.6% |
| Period 1 of 2026-27 | 2,393 | 67.1% | 2.5% |
| Period 13 of 2025-26 | 2,439 | 64.5% | 1.7% |
| Period 12 of 2025-26 | 2,168 | 57.5% | 1.7% |
| Period 11 of 2025-26 | 2,170 | 58.4% | 2.1% |
| Period 10 of 2025-26 | 2,011 | 59.9% | 4.5% |
| Period 9 of 2025-26 | 2,096 | 45.6% | 5.0% |
| Period 8 of 2025-26 | 2,140 | 47.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sowerby Bridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 2,030 | 60.7% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out