South Ruislip
SRULondonManaged by London Underground
How this station is performing
South Ruislip had 15,570 scheduled stops to Period 7 of 2026-27, about 43 a day. 89.5% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
South Ruislip opened on 1 May 1908, 118 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrow-on-the-Hill is the oldest (1880) and Northolt Park the newest (1926), with South Ruislip in between.
The nearest stations to South Ruislip are Northolt Park (2.7 km east), West Ruislip (3.0 km north-west), Greenford (4.1 km south-east), Sudbury Hill Harrow (4.3 km east) and Harrow-on-the-Hill (5.0 km north-east). 32 stations lie within 10 km in all. Of the five, Greenford is the most punctual at 96.8% and Harrow-on-the-Hill the least at 88.2%, with South Ruislip on 89.5%.
South Ruislip takes its name from an area of London called South Ruislip, and the station stands 0.4 km from its centre.
For South Ruislip, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 85.6% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2024-25, at 95.7%, which is 10.1 percentage points higher. Cancellations peaked at 8.1% of scheduled stops in Period 11 of 2023-24, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in London, South Ruislip is the most punctual, at 89.5%. The comparison group includes Northolt Park (89.4%), West Ruislip (88.4%) and Berrylands (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 15,570 | 89.5% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at South Ruislip? Delay Repay
These operators call at South Ruislip and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,223 | 88.5% | 1.3% |
| Period 6 of 2026-27 | 1,145 | 85.8% | 1.7% |
| Period 5 of 2026-27 | 1,242 | 87.1% | 2.2% |
| Period 4 of 2026-27 | 1,255 | 85.6% | 1.8% |
| Period 3 of 2026-27 | 1,153 | 88.1% | 2.1% |
| Period 2 of 2026-27 | 1,210 | 89.3% | 1.7% |
| Period 1 of 2026-27 | 1,386 | 92.7% | 1.2% |
| Period 13 of 2025-26 | 1,207 | 93.7% | 3.0% |
| Period 12 of 2025-26 | 1,216 | 93.1% | 0.7% |
| Period 11 of 2025-26 | 1,100 | 90.4% | 1.2% |
| Period 10 of 2025-26 | 1,074 | 89.6% | 0.8% |
| Period 9 of 2025-26 | 1,174 | 89.0% | 4.0% |
| Period 8 of 2025-26 | 1,185 | 90.2% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northolt Park | 15,629 | 89.4% | 1.9% |
| West Ruislip | 15,103 | 88.4% | 1.8% |
| Berrylands | 16,377 | 84.8% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out