Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Northolt Park

NLTLondonManaged by Chiltern Railways

On time, last 13 periods89.4%Great Britain: 83.6%
Cancelled1.9%Great Britain: 3.2%
Stops a day43Scheduled, on average
Punctuality rank595th of 2,374Among ranked stations

How this station is performing

Northolt Park had 15,629 scheduled stops to Period 7 of 2026-27, about 43 a day. 89.4% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.

Northolt Park opened on 19 July 1926, 100 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Northolt Park is the newest; the oldest, Harrow-on-the-Hill, opened in 1880.

The nearest stations to Northolt Park are Sudbury Hill Harrow (1.6 km east), Greenford (2.0 km south-east), South Ruislip (2.7 km west), Harrow-on-the-Hill (2.9 km north-east) and Sudbury and Harrow Road (3.0 km east). 42 stations lie within 10 km in all. Of the five, Greenford is the most punctual at 96.8% and Harrow-on-the-Hill the least at 88.2%, with Northolt Park on 89.4%.

Northolt Park is named after Northolt, an area of London, home to about 30,304 people, but the station stands 1.4 km from its centre.

For Northolt Park, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 85.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2024-25, at 95.4%, which is 9.9 percentage points higher. Cancellations peaked at 7.7% of scheduled stops in Period 11 of 2023-24, against 1.9% over the latest 13 periods.

1 of 3 stations of a similar size in London are more punctual than Northolt Park on 89.4%. The comparison group includes South Ruislip (89.5%), West Ruislip (88.4%) and Berrylands (84.8%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 87.1%Period 2 of 2023-24: 92.3%Period 3 of 2023-24: 93.4%Period 4 of 2023-24: 94.6%Period 5 of 2023-24: 94.7%Period 6 of 2023-24: 95.0%Period 7 of 2023-24: 94.7%Period 8 of 2023-24: 95.1%Period 9 of 2023-24: 92.9%Period 10 of 2023-24: 92.9%Period 11 of 2023-24: 88.0%Period 12 of 2023-24: 90.7%Period 13 of 2023-24: 93.8%Period 1 of 2024-25: 95.4%Period 2 of 2024-25: 93.9%Period 3 of 2024-25: 92.5%Period 4 of 2024-25: 91.1%Period 5 of 2024-25: 92.0%Period 6 of 2024-25: 94.5%Period 7 of 2024-25: 86.8%Period 8 of 2024-25: 90.8%Period 9 of 2024-25: 89.2%Period 10 of 2024-25: 92.2%Period 11 of 2024-25: 93.9%Period 12 of 2024-25: 93.5%Period 13 of 2024-25: 94.0%Period 1 of 2025-26: 94.3%Period 2 of 2025-26: 92.3%Period 3 of 2025-26: 90.6%Period 4 of 2025-26: 89.0%Period 5 of 2025-26: 88.5%Period 6 of 2025-26: 92.0%Period 7 of 2025-26: 92.6%Period 8 of 2025-26: 90.0%Period 9 of 2025-26: 89.3%Period 10 of 2025-26: 90.9%Period 11 of 2025-26: 89.4%Period 12 of 2025-26: 93.4%Period 13 of 2025-26: 92.7%Period 1 of 2026-27: 93.0%Period 2 of 2026-27: 89.7%Period 3 of 2026-27: 87.9%Period 4 of 2026-27: 85.5%Period 5 of 2026-27: 86.7%Period 6 of 2026-27: 86.5%Period 7 of 2026-27: 87.3%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 3.1%Period 2 of 2023-24: 1.5%Period 3 of 2023-24: 0.7%Period 4 of 2023-24: 0.5%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 2.6%Period 8 of 2023-24: 1.4%Period 9 of 2023-24: 1.3%Period 10 of 2023-24: 3.2%Period 11 of 2023-24: 7.7%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 1.3%Period 1 of 2024-25: 0.1%Period 2 of 2024-25: 0.6%Period 3 of 2024-25: 1.4%Period 4 of 2024-25: 1.4%Period 5 of 2024-25: 2.3%Period 6 of 2024-25: 2.2%Period 7 of 2024-25: 5.6%Period 8 of 2024-25: 1.9%Period 9 of 2024-25: 2.1%Period 10 of 2024-25: 4.0%Period 11 of 2024-25: 0.9%Period 12 of 2024-25: 3.2%Period 13 of 2024-25: 0.5%Period 1 of 2025-26: 0.6%Period 2 of 2025-26: 1.0%Period 3 of 2025-26: 2.0%Period 4 of 2025-26: 1.0%Period 5 of 2025-26: 1.5%Period 6 of 2025-26: 1.6%Period 7 of 2025-26: 1.1%Period 8 of 2025-26: 1.7%Period 9 of 2025-26: 4.1%Period 10 of 2025-26: 1.0%Period 11 of 2025-26: 1.2%Period 12 of 2025-26: 0.6%Period 13 of 2025-26: 3.3%Period 1 of 2026-27: 1.2%Period 2 of 2026-27: 1.8%Period 3 of 2026-27: 2.2%Period 4 of 2026-27: 2.3%Period 5 of 2026-27: 1.8%Period 6 of 2026-27: 1.6%Period 7 of 2026-27: 1.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways15,62989.4%1.9%

Operators with their own page for this station are linked to it.

Late train at Northolt Park? Delay Repay

These operators call at Northolt Park and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,21887.3%1.5%
Period 6 of 2026-271,15286.5%1.6%
Period 5 of 2026-271,24686.7%1.8%
Period 4 of 2026-271,26485.5%2.3%
Period 3 of 2026-271,16387.9%2.2%
Period 2 of 2026-271,20789.7%1.8%
Period 1 of 2026-271,38293.0%1.2%
Period 13 of 2025-261,20992.7%3.3%
Period 12 of 2025-261,21893.4%0.6%
Period 11 of 2025-261,13689.4%1.2%
Period 10 of 2025-261,07390.9%1.0%
Period 9 of 2025-261,17689.3%4.1%
Period 8 of 2025-261,18590.0%1.7%

Time of year

75%80%85%90%95%P1: 92.2%1P2: 91.9%2P3: 91.0%3P4: 89.5%4P5: 90.4%5P6: 92.0%6P7: 90.1%7P8: 92.0%8P9: 90.3%9P10: 92.0%10P11: 90.9%11P12: 92.6%12P13: 93.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
South Ruislip15,57089.5%1.8%
West Ruislip15,10388.4%1.8%
Berrylands16,37784.8%3.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out