South Hampstead
SOHLondonManaged by London Overground
How this station is performing
South Hampstead had 52,537 scheduled stops to Period 7 of 2026-27, about 144 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
South Hampstead opened on 10 July 1922, 104 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, South Hampstead is the newest; the oldest, Kilburn High Road, opened in 1852.
The nearest stations to South Hampstead are Kilburn High Road (1.0 km south-west), Finchley Road and Frognal (1.0 km north), West Hampstead (1.1 km north-west), West Hampstead Thameslink (1.2 km north-west) and Brondesbury (1.7 km west). 108 stations lie within 10 km in all. At 92.6%, South Hampstead is more punctual than every one of them; the best of the five, Kilburn High Road, manages 92.5%.
South Hampstead takes its name from an area of London called South Hampstead, and the station stands 0.4 km from its centre.
South Hampstead has slipped a little, from 95.9% within three minutes in the previous 13 periods to 92.6% in the latest 13, a fall of 3.3 percentage points. Cancellations rose to 3.2% of scheduled stops from 2.1%, which is 1.1 percentage points more.
Compared with 3 stations of a similar size in London, South Hampstead is the most punctual, at 92.6%. The comparison group includes Cricklewood (72.3%), Hendon (75.8%) and Motspur Park (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 52,537 | 92.6% | 3.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,888 | 88.5% | 1.7% |
| Period 6 of 2026-27 | 3,957 | 89.4% | 4.2% |
| Period 5 of 2026-27 | 3,714 | 93.4% | 4.3% |
| Period 4 of 2026-27 | 3,955 | 91.1% | 2.9% |
| Period 3 of 2026-27 | 3,864 | 93.0% | 2.6% |
| Period 2 of 2026-27 | 3,578 | 93.7% | 3.9% |
| Period 1 of 2026-27 | 4,061 | 94.8% | 1.9% |
| Period 13 of 2025-26 | 4,348 | 96.2% | 1.6% |
| Period 12 of 2025-26 | 4,002 | 93.1% | 3.4% |
| Period 11 of 2025-26 | 4,358 | 92.2% | 4.1% |
| Period 10 of 2025-26 | 4,783 | 92.4% | 4.9% |
| Period 9 of 2025-26 | 4,250 | 90.7% | 4.1% |
| Period 8 of 2025-26 | 3,779 | 95.0% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cricklewood | 52,629 | 72.3% | 7.3% |
| Hendon | 52,631 | 75.8% | 7.4% |
| Motspur Park | 52,278 | 86.1% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out